## Issue ## Test ### Unit Test Coverage Before: ``` ``` After: ``` ``` ### Test/Run Logs ## Operational Checklist 1. **Does this PR introduce backward-incompatible changes to the on-disk data structure and/or the over-the-wire protocol?**. (If no, skip to question 8.) **YES|NO** 2. **Describe the migration plan.**. For each flag epoch, describe what changes take place at the flag epoch, the anticipated interactions between upgraded/non-upgraded nodes, and any special operational considerations for the migration. 3. **Describe how the plan was tested.** 4. **How much minimum baking period after the last flag epoch should we allow on Pangaea before promotion onto mainnet?** 5. **What are the planned flag epoch numbers and their ETAs on Pangaea?** 6. **What are the planned flag epoch numbers and their ETAs on mainnet?** Note that this must be enough to cover baking period on Pangaea. 7. **What should node operators know about this planned change?** 8. **Does this PR introduce backward-incompatible changes *NOT* related to on-disk data structure and/or over-the-wire protocol?** (If no, continue to question 11.) **YES|NO** 9. **Does the existing `node.sh` continue to work with this change?** 10. **What should node operators know about this change?** 11. **Does this PR introduce significant changes to the operational requirements of the node software, such as >20% increase in CPU, memory, and/or disk usage?** ## TODO