#-- copyright
# OpenProject is an open source project management software.
# Copyright (C) 2012-2020 the OpenProject GmbH
#
# This program is free software; you can redistribute it and/or
# modify it under the terms of the GNU General Public License version 3.
#
# OpenProject is a fork of ChiliProject, which is a fork of Redmine. The copyright follows:
# Copyright (C) 2006-2017 Jean-Philippe Lang
# Copyright (C) 2010-2013 the ChiliProject Team
#
# This program is free software; you can redistribute it and/or
# modify it under the terms of the GNU General Public License
# as published by the Free Software Foundation; either version 2
# of the License, or (at your option) any later version.
#
# This program is distributed in the hope that it will be useful,
# but WITHOUT ANY WARRANTY; without even the implied warranty of
# MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the
# GNU General Public License for more details.
#
# You should have received a copy of the GNU General Public License
# along with this program; if not, write to the Free Software
# Foundation, Inc., 51 Franklin Street, Fifth Floor, Boston, MA 02110-1301, USA.
#
# See docs/COPYRIGHT.rdoc for more details.
#++
en :
seeders :
bim :
default_type_clash : Clash
default_type_issue : Issue
default_type_remark : Remark
default_type_request : Request
default_status_resolved : Resolved
default_priority_critical : Critical
demo_data :
global_queries :
- name : "Embedded table: Children"
parent : '{id}'
timeline : false
sort_by : id
hidden : true
is_public : false
columns :
- type
- id
- subject
- status
- assigned_to
- priority
- project
type_configuration :
- type : : default_type_phase
form_configuration :
- group_name : "Children"
query_name : "Embedded table: Children"
groups :
- name : Architects
- name : BIM Coordinators
- name : BIM Managers
- name : BIM Modellers
- name : Lead BIM Coordinators
- name : MEP Engineers
- name : Planners
- name : Structural Engineers
welcome :
title : "Welcome to OpenProject BIM Edition!"
text : |
Checkout the demo projects to get started with some examples.
* [ (Demo) Construction project](%{base_url}/projects/demo-construction-project): Planning, BIM process, BCF management, and constructing, all at a glance.
* [ (Demo) Planning & constructing](%{base_url}/projects/demo-planning-constructing-project): Classical planning and construction management.
* [ (Demo) Bim project](%{base_url}/projects/demo-bim-project): BIM process and coordination.
* [ (Demo) BCF management](%{base_url}/projects/demo-bcf-management-project): BCF management.
Also, you can create a blank [new project](%{base_url}/projects/new).
Never stop collaborating. With open source and open mind.
You can change this welcome text [here](%{base_url}/settings).
projects :
demo-construction-project :
name : (Demo) Construction project
identifier : demo-construction-project
status :
code : on_track
description : All tasks and the sub-projects are on schedule. The people involved know their tasks. The system is completely set up.
description : This is a short summary of the goals of this demo construction project.
timeline :
name : Timeline
modules :
- work_package_tracking
- news
- wiki
- board_view
news :
- title : Welcome to your demo project
summary : >
We are glad you joined.
In this module you can communicate project news to your team members.
description : The actual news
types :
- : default_type_task
- : default_type_milestone
- : default_type_phase
categories :
- Category 1 (to be changed in Project settings)
queries :
- name : Project plan
status : open
timeline : true
sort_by : start_date
hierarchy : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
- name : Milestones
status : open
type : : default_type_milestone
timeline : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
sort_by : start_date
- name : Tasks
status : open
type : : default_type_task
hierarchy : true
sort_by : id
columns :
- id
- subject
- priority
- type
- status
- assigned_to
boards :
bcf :
name : "Simple drag'n drop workflow"
work_packages : [ ]
demo-planning-constructing-project :
name : (Demo) Planning & constructing
identifier : demo-planning-constructing-project
status :
code : on_track
description : All tasks are on schedule. The people involved know their tasks. The system is completely set up.
parent : demo-construction-project
description : This is a short summary of the goals of this demo planning and constructing project.
timeline :
name : Timeline
modules :
- work_package_tracking
- news
- wiki
- board_view
news :
- title : Welcome to your demo project
summary : >
We are glad you joined.
In this module you can communicate project news to your team members.
description : The actual news
types :
- : default_type_task
- : default_type_milestone
- : default_type_phase
categories :
- Category 1 (to be changed in Project settings)
queries :
- name : Project plan
status : open
timeline : true
sort_by : start_date
hierarchy : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
- name : Milestones
status : open
type : : default_type_milestone
timeline : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
sort_by : start_date
- name : Tasks
status : open
type : : default_type_task
hierarchy : true
sort_by : id
columns :
- id
- subject
- priority
- type
- status
- assigned_to
work_packages :
- :start : 4
:subject : Project kick off construction project
:description : |-
The project kick off initializes the start of the project in your company. Everybody being part of this project should be invited to the kick off for a first briefing.
The next step could be checking out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-construction-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
:status : default_status_new
:type : default_type_milestone
:assigned_to : Planners
:duration : 0
- :start : 7
:subject : Basic evaluation
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 7
:subject : Gathering first project information
:description : |-
## Goal
* Define tasks based on the customer needs
* Time frame and cost estimation shall be defined
## Description
* Identify the customer needs by having a workshop with him/ her
* Each need shall represent a task with its corresponding work packages
* Derive the cost estimation and time frame
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 4
- :start : 14
:subject : Summarize the results
:description : |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 4
:relations :
- :to : Gathering first project information
:type : follows
- :start : 21
:subject : End of basic evaluation
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : Planners
:duration : 0
:relations :
- :to : Summarize the results
:type : follows
:assigned_to : Planners
:duration : 14
:relations :
- :to : Project kick off construction project
:type : follows
- :start : 22
:subject : Preliminary planning
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 22
:subject : Developing first draft
:description : |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 10
:relations :
- :to : End of basic evaluation
:type : follows
- :start : 35
:subject : Summarize results
:description : |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 4
:relations :
- :to : Developing first draft
:type : follows
:assigned_to : Planners
:duration : 17
- :start : 42
:subject : Passing of preliminary planning
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : Planners
:duration : 0
:relations :
- :to : Summarize results
:type : follows
- :start : 44
:subject : Design planning
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 44
:subject : Finishing design
:description : |-
## Goal
* Design is done
* All parties are happy with the results of the design planning phase
## Description
* The design of the project will be finished
* All parties agree on the design
* The owner is happy with the results
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 45
:relations :
- :to : Passing of preliminary planning
:type : follows
- :start : 90
:subject : Design freeze
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : Planners
:duration : 0
:relations :
- :to : Finishing design
:type : follows
:assigned_to : Planners
:duration : 46
- :start : 98
:subject : Construction phase
:description : ''
:status : default_status_new
:type : default_type_phase
:children :
- :start : 98
:subject : Start constructing
:description : |-
## Goal
* Ground breaking ceremony
* Setting up the construction site
* ...
## Description
* Preparing the site for the project
* Get the team together
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 31
- :start : 130
:subject : Foundation
:description : |-
## Goal
* Laying of the foundation stone
* ...
## Description
* Setting up the concrete mixer
* Setting up the supply chain for the concrete
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 25
:relations :
- :to : Start constructing
:type : follows
- :start : 149
:subject : Building construction
:description : |-
## Goal
* Topping out ceremony
* Walls and ceilings are done
* ...
## Description
* Creating all structural levels of the building
* Installing doors and windows
* Finishing the roof structure
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 46
- :start : 164
:subject : Finishing the facade
:description : |-
## Goal
* Facade is done
* Whole building is waterproof
* ...
## Description
* Install all elements for the facade
* Finish the roof
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 32
- :start : 178
:subject : Installing the building service systems
:description : |-
## Goal
* All building service systems are ready to be used
## Description
* Installing the heating system
* Installing the climate system
* Electrical installation
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 25
- :start : 189
:subject : Final touches
:description : |-
## Goal
* Handover of the keys
* The customer is happy with his building
* ...
## Description
* Finishing the installation of the building service systems
* Finishing the interior construction
* Finishing the facade
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 18
- :start : 208
:subject : House warming party
:description : |-
## Goal
* Have a blast!
## Description
* Invite the construction team
* Invite your friends
* Bring some drinks, snacks and your smile
:status : default_status_new
:type : default_type_milestone
:duration : 0
:relations :
- :to : Final touches
:type : follows
:assigned_to : Planners
:duration : 110
:relations :
- :to : Design freeze
:type : follows
demo-bim-project :
name : (Demo) BIM project
identifier : demo-bim-project
status :
code : on_track
description : All tasks and sub-projects are on schedule. The people involved know their tasks. The system is completely set up.
parent : demo-construction-project
description : This is a short summary of the goals of this demo BIM project.
timeline :
name : Timeline
modules :
- work_package_tracking
- news
- wiki
- board_view
news :
- title : Welcome to your demo project
summary : >
We are glad you joined.
In this module you can communicate project news to your team members.
description : The actual news
types :
- : default_type_task
- : default_type_milestone
- : default_type_phase
categories :
- Category 1 (to be changed in Project settings)
queries :
- name : Project plan
status : open
timeline : true
sort_by : start_date
hierarchy : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
- name : Milestones
status : open
type : : default_type_milestone
timeline : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
sort_by : start_date
- name : Tasks
status : open
type : : default_type_task
hierarchy : true
sort_by : id
columns :
- id
- subject
- priority
- type
- status
- assigned_to
work_packages :
- :start : 14
:subject : Project kick off creating BIM model
:description : |-
The project Kickoff initializes the start of the project in your company. The whole project team should be invited to the Kickoff for a first briefing.
The next step could be to check out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-bim-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Managers
:duration : 0
- :start : 15
:subject : Project preperation
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 15
:subject : Gathering the project specific data and information for the BIM model
:description : |-
## Goal
* Identify the information strategy for the customer (e.g. by using plain language questions)
* If provided, analyze the customer information requirements for the BIM model
* Define an information delivery strategy according to the customers needs
## Description
* Analyzing the customers needs and goals for using the BIM methodology
* Results of this tasks should be :
* The requirements for the project
* A strategy for the delivery phase
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Planners
:duration : 14
:relations :
- :to : Project kick off creating BIM model
:type : follows
- :start : 33
:subject : Creating the BIM execution plan
:description : |-
# Goal
* A BIM execution plan will be defined according to the exchange requirements specifications (ERS)
* All team members and partners have a plan on how to reach each of the project goals
# Description
* Depending on the identifies use cases, the individual Information Delivery Manuals will be defined
* To handle the technological interfaces, a software topology will be defined and analyzed and verified
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Lead BIM Coordinators
:duration : 18
:relations :
- :to : Gathering the project specific data and information for the BIM model
:type : follows
- :start : 52
:subject : Completion of the BIM execution plan
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : seeders.bim.default_status_resolved
:type : default_type_milestone
:assigned_to : BIM Coordinators
:duration : 0
:relations :
- :to : Creating the BIM execution plan
:type : follows
:assigned_to : BIM Managers
:duration : 37
- :start : 53
:subject : End of preperation phase
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Managers
:duration : 0
:relations :
- :to : Project preperation
:type : follows
- :start : 54
:subject : Creating inital BIM model
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 54
:subject : Modelling inital BIM model
:description : |-
# Goal
* Modelling the inital BIM model
* Creating a BIM model for the whole project team
# Description
* According to the gathered data from the customer, the inital model will be modelled
* The model shall be modelled according to the LOD Matrices and contain the information needed
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Modellers
:duration : 7
:relations :
- :to : End of preperation phase
:type : follows
- :start : 62
:subject : Initial, internal model check and revising
:description : |-
# Goal
* Submitting a BIM model according to the defined standards
# Description
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : Lead BIM Coordinators
:duration : 2
:relations :
- :to : Modelling inital BIM model
:type : follows
- :start : 65
:subject : Submitting inital BIM model
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Modellers
:duration : 0
:relations :
- :to : Initial, internal model check and revising
:type : follows
:assigned_to : Architects
:duration : 11
:relations :
- :to : Completion of the BIM execution plan
:type : follows
- :start : 66
:subject : Modelling, first cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 66
:subject : Referencing external BIM models
:description : |-
# Goal
* Having a foundation for developing the internal model/ offering answers
* Using the external model to develop the internal model
# Description
* The external model will be referenced in the BIM platform, thus used for modelling the internal model
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Modellers
:duration : 0
:relations :
- :to : Submitting inital BIM model
:type : follows
- :start : 67
:subject : Modelling the BIM model
:description : |-
# Goal
* Creating a BIM model for the project
* Creating a BIM model for the whole project team
# Description
* The model will be created according to the BIM execution plan
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Modellers
:duration : 6
:relations :
- :to : Referencing external BIM models
:type : follows
- :start : 74
:subject : First Cycle, internal model check and revising
:description : |-
# Goal
* Submitting a BIM model according to the defined standards
# Description
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised.
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Coordinators
:duration : 1
:relations :
- :to : Modelling the BIM model
:type : follows
- :start : 76
:subject : Submitting BIM model
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Modellers
:duration : 0
:relations :
- :to : First Cycle, internal model check and revising
:type : follows
:assigned_to : BIM Coordinators
:duration : 10
:relations :
- :to : Submitting inital BIM model
:type : follows
- :start : 77
:subject : Coordination, first cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:children :
- :start : 77
:subject : Coordinate the different BIM models
:description : |-
# Goal
* Assemble the different BIM models of the whole project team
* Coordinate the identified issues
# Description
* The different BIM models will be assembled and checked
* The identified model specific issues will be communicated via BCF files
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Coordinators
:duration : 3
- :start : 77
:subject : Issue management, first cycle
:description : ''
:status : default_status_new
:type : default_type_phase
:assigned_to : BIM Coordinators
:duration : 4
- :start : 82
:subject : Finishing coordination, first cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : Lead BIM Coordinators
:duration : 0
:relations :
- :to : Issue management, first cycle
:type : follows
:assigned_to : Lead BIM Coordinators
:duration : 5
:relations :
- :to : Submitting BIM model
:type : follows
- :start : 83
:subject : Modelling & coordinating, second cycle
:description : "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
:status : default_status_new
:type : default_type_phase
:assigned_to : Lead BIM Coordinators
:duration : 0
:relations :
- :to : Finishing coordination, first cycle
:type : follows
- :start : 84
:subject : Modelling & coordinating, ... cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:assigned_to : Lead BIM Coordinators
:duration : 0
:relations :
- :to : Modelling & coordinating, second cycle
:type : follows
- :start : 85
:subject : Modelling & coordinating, (n-th minus 1) cycle
:description : "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
:status : default_status_new
:type : default_type_phase
:assigned_to : Lead BIM Coordinators
:duration : 0
:relations :
- :to : Modelling & coordinating, ... cycle
:type : follows
- :start : 86
:subject : Modelling & coordinating n-th cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_phase
:assigned_to : BIM Coordinators
:duration : 0
:relations :
- :to : Modelling & coordinating, (n-th minus 1) cycle
:type : follows
- :start : 87
:subject : Finishing modelling & coordinating, n-th cycle
:description : This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Coordinators
:duration : 0
:relations :
- :to : Modelling & coordinating n-th cycle
:type : follows
- :start : 88
:subject : Use model for construction phase
:description : ''
:status : default_status_new
:type : default_type_phase
:children :
- :start : 88
:subject : Handover model for construction crew
:description : |-
## Goal
* Everyone knows the model and their tasks
* Everybody gets all the relevant information, model based
* ...
## Description
* The Kickoff on the construction site includes an introduction to the model
* All the objects should have the information needed for the assigned tasks. If not, data enrichment of the model needs to be done
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Coordinators
:duration : 5
- :start : 98
:subject : Construct the building
:description : |-
## Goal
* New issues realized on construction site will be handled model based
* Issues will be documented by using the BCF files and the BIM model
## Description
* New issues will be documented using BCF files as sticky notes for the model
* The BCF files will be used to assign, track and correct issues
* ...
:status : default_status_new
:type : default_type_task
:assigned_to : BIM Coordinators
:duration : 101
- :start : 200
:subject : Finish construction
:description : ''
:status : default_status_new
:type : default_type_milestone
:assigned_to : BIM Coordinators
:duration : 0
:relations :
- :to : Construct the building
:type : follows
:assigned_to : BIM Coordinators
:duration : 112
:relations :
- :to : Finishing modelling & coordinating, n-th cycle
:type : follows
- :start : 98
:subject : Issue management, construction phase
:description : ''
:status : default_status_new
:type : default_type_phase
:assigned_to : Planners
:duration : 88
- :start : 210
:subject : Handover for Facility Management
:description : |-
## Goal
* The BIM model will be used for the Facility Management
* The model provides all the relevant information for commissioning and operating the building
* ...
## Description
* The model contains the relevant information for the facility manager
* The model can be used for the operating system of the building
* ...
:status : default_status_new
:type : default_type_milestone
:assigned_to : Lead BIM Coordinators
:duration : 0
:relations :
- :to : Finish construction
:type : follows
- :start : 211
:subject : Asset Management
:description : Enjoy your building :)
:status : default_status_new
:type : default_type_phase
:duration : 0
:relations :
- :to : Handover for Facility Management
:type : follows
demo-bcf-management-project :
name : (Demo) BCF management
identifier : demo-bcf-management-project
status :
code : on_track
description : All tasks are on schedule. The people involved know their tasks. The system is completely set up.
parent : demo-bim-project
description : This is a short summary of the goals of this demo BCF management project.
timeline :
name : Timeline
modules :
- work_package_tracking
- bim
- board_view
ifc_models :
- file : 'hospital_architecture'
name : 'Hospital - Architecture (cc-by-sa-3.0 Autodesk Inc.)'
default : true
- file : 'hospital_structural'
name : 'Hospital - Structural (cc-by-sa-3.0 Autodesk Inc.)'
default : true
- file : 'hospital_mechanical'
name : 'Hospital - Mechanical (cc-by-sa-3.0 Autodesk Inc.)'
default : false
types :
- : default_type_task
- : default_type_milestone
- : default_type_phase
- 'seeders.bim.default_type_clash'
- 'seeders.bim.default_type_request'
- 'seeders.bim.default_type_issue'
- 'seeders.bim.default_type_remark'
categories :
- Category 1 (to be changed in Project settings)
queries :
- name : Issues
status : open
type : 'seeders.bim.default_type_issue'
display_representation : card
- name : Clashes
status : open
type : 'seeders.bim.default_type_clash'
display_representation : card
- name : Requests
status : open
type : 'seeders.bim.default_type_request'
display_representation : card
- name : Remarks
status : open
type : 'seeders.bim.default_type_remark'
display_representation : card
- name : Project plan
status : open
timeline : true
sort_by : start_date
hierarchy : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
- name : Milestones
status : open
type : : default_type_milestone
timeline : true
columns :
- id
- type
- status
- subject
- start_date
- due_date
sort_by : start_date
- name : Tasks
status : open
type : : default_type_task
hierarchy : true
sort_by : id
columns :
- id
- subject
- priority
- type
- status
- assigned_to
boards :
bcf :
name : "BCF issues"
bcf_xml_file : "seed.bcfzip"
work_packages :
- :start : 77
:bcf_issue_uuid : fbbf9ecf-5721-4bf1-a08c-aed50dc19353
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f6271a32-acf5-49f8-a1b5-7c445f9158e5
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f210a2cd-f1f7-4691-b986-2f94117caefe
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : feb97e6e-14fd-4c62-bbad-607f2bb4ebf5
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : 00efc0da-b4d5-4933-bcb6-e01513ee2bcc
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f9e079a8-02f5-40f0-a08a-171f494ee130
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f70417a8-174a-42ae-bf1e-a0b6457d0e6f
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f55d0ec0-9a0f-4222-9926-cc5744888b02
:assigned_to : BIM Modellers
:duration : 4
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : fc560c06-51fc-44fa-81b4-e688be189c6a
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : fe2f9c1f-631b-4b37-91ea-833c4751725a
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : fc5099c0-bedb-4770-a576-0429a7733517
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : 010d9884-8c93-4551-b2bc-570faffe7082
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : febee8e1-1ad2-45e5-b08d-b4be92d25ad6
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : f4d71d45-5a2c-4dad-bcb1-8a4935f2ea69
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : fb9705ea-b32c-46ff-bb6f-d1d049494e05
:assigned_to : BIM Modellers
:duration : 4
:parent : Issue management, first cycle
- :start : 77
:bcf_issue_uuid : fbe1d941-06ce-45f4-8ccb-ef48b8426f72
:assigned_to : BIM Modellers
:duration : 3
:parent : Issue management, first cycle
- :start : 98
:bcf_issue_uuid : 73def76d-939d-404c-9bd0-581399f92714
:duration : 8
:parent : Issue management, construction phase
- :start : 98
:bcf_issue_uuid : b5105e2e-add1-4d48-abb9-ce51fcea3bdd
:duration : 8
:parent : Issue management, construction phase
- :start : 98
:bcf_issue_uuid : 99f03fde-4c74-4a8f-940a-c741738ab073
:duration : 2
:parent : Issue management, construction phase
- :start : 111
:bcf_issue_uuid : af1de642-6d08-489b-8056-ca4c383e0617
:duration : 8
:parent : Issue management, construction phase
- :start : 114
:bcf_issue_uuid : e6276745-3d58-4d40-80fb-6de5cb05077e
:duration : 8
:parent : Issue management, construction phase
- :start : 149
:bcf_issue_uuid : efd7be98-1a64-4a35-ad4c-51b8881d79ed
:duration : 8
:parent : Issue management, construction phase
- :start : 152
:bcf_issue_uuid : f689bfd4-ec09-45ca-bbe3-7d1d0f5d9933
:duration : 21
:parent : Issue management, construction phase
- :start : 178
:bcf_issue_uuid : 3746180f-ba1e-4ea0-a0fb-6ee69ccabd85
:duration : 8
:parent : Issue management, construction phase
- :start : 178
:bcf_issue_uuid : 2adbdbb4-bb60-4250-b8af-3cd786437814
:duration : 8
:parent : Issue management, construction phase