# Upgrading your OpenProject installation
|
||
|
|
||
|
Note: this guide only applies if you've installed OpenProject using our DEB/RPM
|
||
|
packages.
|
||
|
|
||
|
Upgrading OpenProject is as easy as installing a newer OpenProject package and
|
||
|
running the `openproject configure` command.
|
||
|
|
||
|
## Debian / Ubuntu
|
||
|
|
||
|
sudo apt-get update
|
||
|
sudo apt-get install --only-upgrade openproject
|
||
|
sudo openproject configure
|
||
|
|
||
|
## CentOS / RHEL
|
||
|
|
||
|
sudo yum update
|
||
|
sudo yum install openproject
|
||
|
sudo openproject configure
|
||
|
|
||
|
## SuSE
|
||
|
|
||
|
sudo zypper update openproject
|
||
|
sudo openproject configure
|
||
|
|
||
|
|
||
|
## Re-configuring the application
|
||
|
|
||
|
Using `openproject configure`, the wizard will display new steps that you weren't available or configured in previous installations.
|
||
|
If you want to perform changes to your configuration or are unsure what steps are available, you can safely run `openproject reconfigure` to walk through the entire configuration process again.
|
||
|
|
||
|
Note that this still takes previous values into consideration. Values that should not change from your previous configurations can be skipped by pressing `<Return>`. This also applies for steps with passwords, which are shown as empty even though they may have a value. Skipping those steps equals to re-use the existing value.
|
||
|
|
||
|
|
||
|
# Upgrading between major releases (DEB/RPM packages)
|
||
|
|
||
|
Since OpenProject 6.0.0 is a major upgrade, you will need to perform some basic manual steps to upgrade your package.
|
||
|
|
||
|
If you have currently installed the stable 5.0.x release of OpenProject by using the `stable/5` package source,
|
||
|
you will need to adjust that package source.
|
||
|
|
||
|
### APT-based systems (Debian, Ubuntu)
|
||
|
|
||
|
- Update the reference to `stable/5` in `/etc/apt/sources.list.d/openproject.list` to `stable/6`.
|
||
|
- Perform the Upgrade steps as mentioned above in *Upgrading your OpenProject installation*
|
||
|
|
||
|
### YUM-based systems (CentOS, RHEL)
|
||
|
|
||
|
- Update the reference to `stable/5` in `/etc/yum.repos.d/openproject.repo` to `stable/6`.
|
||
|
- Perform the Upgrade steps as mentioned above in *Upgrading your OpenProject installation*
|
||
|
|
||
|
### SUSE Linux Enterprise Server 11, 11
|
||
|
|
||
|
- Update the reference to `stable/5` in `/etc/zypp/repos.d/openproject.repo` to `stable/6`.
|
||
|
- Perform the Upgrade steps as mentioned above in *Upgrading your OpenProject installation*
|