update locales from crowdin [ci skip]

pull/8780/head
Travis CI User 4 years ago
parent 18a5e1db91
commit 9843917e0c
  1. 4
      config/locales/crowdin/js-ar.yml
  2. 4
      config/locales/crowdin/js-bg.yml
  3. 4
      config/locales/crowdin/js-ca.yml
  4. 4
      config/locales/crowdin/js-cs.yml
  5. 4
      config/locales/crowdin/js-da.yml
  6. 4
      config/locales/crowdin/js-de.yml
  7. 4
      config/locales/crowdin/js-el.yml
  8. 4
      config/locales/crowdin/js-es.yml
  9. 4
      config/locales/crowdin/js-fi.yml
  10. 4
      config/locales/crowdin/js-fil.yml
  11. 4
      config/locales/crowdin/js-fr.yml
  12. 4
      config/locales/crowdin/js-hr.yml
  13. 4
      config/locales/crowdin/js-hu.yml
  14. 4
      config/locales/crowdin/js-id.yml
  15. 4
      config/locales/crowdin/js-it.yml
  16. 4
      config/locales/crowdin/js-ja.yml
  17. 4
      config/locales/crowdin/js-ko.yml
  18. 4
      config/locales/crowdin/js-lt.yml
  19. 4
      config/locales/crowdin/js-nl.yml
  20. 4
      config/locales/crowdin/js-no.yml
  21. 4
      config/locales/crowdin/js-pl.yml
  22. 4
      config/locales/crowdin/js-pt.yml
  23. 4
      config/locales/crowdin/js-ro.yml
  24. 4
      config/locales/crowdin/js-ru.yml
  25. 4
      config/locales/crowdin/js-sk.yml
  26. 4
      config/locales/crowdin/js-sl.yml
  27. 4
      config/locales/crowdin/js-sv.yml
  28. 4
      config/locales/crowdin/js-tr.yml
  29. 4
      config/locales/crowdin/js-uk.yml
  30. 4
      config/locales/crowdin/js-vi.yml
  31. 4
      config/locales/crowdin/js-zh-CN.yml
  32. 4
      config/locales/crowdin/js-zh-TW.yml
  33. 2
      modules/boards/config/locales/crowdin/js-ar.yml
  34. 2
      modules/boards/config/locales/crowdin/js-bg.yml
  35. 2
      modules/boards/config/locales/crowdin/js-ca.yml
  36. 2
      modules/boards/config/locales/crowdin/js-cs.yml
  37. 2
      modules/boards/config/locales/crowdin/js-da.yml
  38. 2
      modules/boards/config/locales/crowdin/js-de.yml
  39. 2
      modules/boards/config/locales/crowdin/js-el.yml
  40. 2
      modules/boards/config/locales/crowdin/js-es.yml
  41. 2
      modules/boards/config/locales/crowdin/js-fi.yml
  42. 2
      modules/boards/config/locales/crowdin/js-fil.yml
  43. 2
      modules/boards/config/locales/crowdin/js-fr.yml
  44. 2
      modules/boards/config/locales/crowdin/js-hr.yml
  45. 2
      modules/boards/config/locales/crowdin/js-hu.yml
  46. 2
      modules/boards/config/locales/crowdin/js-id.yml
  47. 2
      modules/boards/config/locales/crowdin/js-it.yml
  48. 2
      modules/boards/config/locales/crowdin/js-ja.yml
  49. 2
      modules/boards/config/locales/crowdin/js-ko.yml
  50. 2
      modules/boards/config/locales/crowdin/js-lt.yml
  51. 2
      modules/boards/config/locales/crowdin/js-nl.yml
  52. 2
      modules/boards/config/locales/crowdin/js-no.yml
  53. 2
      modules/boards/config/locales/crowdin/js-pl.yml
  54. 2
      modules/boards/config/locales/crowdin/js-pt.yml
  55. 2
      modules/boards/config/locales/crowdin/js-ro.yml
  56. 2
      modules/boards/config/locales/crowdin/js-ru.yml
  57. 2
      modules/boards/config/locales/crowdin/js-sk.yml
  58. 2
      modules/boards/config/locales/crowdin/js-sl.yml
  59. 2
      modules/boards/config/locales/crowdin/js-sv.yml
  60. 2
      modules/boards/config/locales/crowdin/js-tr.yml
  61. 2
      modules/boards/config/locales/crowdin/js-uk.yml
  62. 2
      modules/boards/config/locales/crowdin/js-vi.yml
  63. 2
      modules/boards/config/locales/crowdin/js-zh-CN.yml
  64. 2
      modules/boards/config/locales/crowdin/js-zh-TW.yml
  65. 15
      modules/reporting/config/locales/crowdin/ar.yml
  66. 15
      modules/reporting/config/locales/crowdin/bg.yml
  67. 15
      modules/reporting/config/locales/crowdin/ca.yml
  68. 15
      modules/reporting/config/locales/crowdin/cs.yml
  69. 15
      modules/reporting/config/locales/crowdin/da.yml
  70. 15
      modules/reporting/config/locales/crowdin/de.yml
  71. 15
      modules/reporting/config/locales/crowdin/el.yml
  72. 15
      modules/reporting/config/locales/crowdin/es.yml
  73. 15
      modules/reporting/config/locales/crowdin/fi.yml
  74. 15
      modules/reporting/config/locales/crowdin/fil.yml
  75. 15
      modules/reporting/config/locales/crowdin/fr.yml
  76. 15
      modules/reporting/config/locales/crowdin/hr.yml
  77. 15
      modules/reporting/config/locales/crowdin/hu.yml
  78. 15
      modules/reporting/config/locales/crowdin/id.yml
  79. 15
      modules/reporting/config/locales/crowdin/it.yml
  80. 15
      modules/reporting/config/locales/crowdin/ja.yml
  81. 15
      modules/reporting/config/locales/crowdin/ko.yml
  82. 15
      modules/reporting/config/locales/crowdin/lt.yml
  83. 15
      modules/reporting/config/locales/crowdin/nl.yml
  84. 15
      modules/reporting/config/locales/crowdin/no.yml
  85. 15
      modules/reporting/config/locales/crowdin/pl.yml
  86. 15
      modules/reporting/config/locales/crowdin/pt.yml
  87. 15
      modules/reporting/config/locales/crowdin/ro.yml
  88. 15
      modules/reporting/config/locales/crowdin/ru.yml
  89. 15
      modules/reporting/config/locales/crowdin/sk.yml
  90. 15
      modules/reporting/config/locales/crowdin/sl.yml
  91. 15
      modules/reporting/config/locales/crowdin/sv.yml
  92. 15
      modules/reporting/config/locales/crowdin/tr.yml
  93. 15
      modules/reporting/config/locales/crowdin/uk.yml
  94. 15
      modules/reporting/config/locales/crowdin/vi.yml
  95. 15
      modules/reporting/config/locales/crowdin/zh-CN.yml
  96. 15
      modules/reporting/config/locales/crowdin/zh-TW.yml

@ -274,9 +274,9 @@ ar:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "تفعيل"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ bg:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Activate"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ ca:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Activar"
label_add_column_after: "Afegir columna desprès"
label_add_column_before: "Afegir columna abans"

@ -274,9 +274,9 @@ cs:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivovat"
label_add_column_after: "Přidat sloupec za"
label_add_column_before: "Přidat sloupec před"

@ -273,9 +273,9 @@ da:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivér"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -273,9 +273,9 @@ de:
current_new_feature_html: >
Die Version enthält zahlreiche neue Funktionen und Verbesserungen: <br> <ul class="%{list_styling_class}"> <li><b>Top-Down-Planung</b> um alle Projektaufgaben zu definieren. Dabei sind die Anfangs- und Enddaten eines Elternelements unabhängig von den Daten der Unteraufgaben.</li> <li><b>Vielseitige agile Boards</b> ermöglichen Ihnen die Erstellung eines Projektstrukturplans oder die Verteilung von Aufgaben auf Unterprojekte.</li> <li><b>Projektvorlagen</b> zur einfachen Erstellung neuer Projekte.</li> <li>Konfiguration der Projektseite ermöglicht ein besseres <b>Projektportfolio-Management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: "https://www.openproject.org/openproject-bim-10-5\n"
current_new_feature_html: >
Die Version enthält zahlreiche neue Funktionen und Verbesserungen: <br> <ul class="%{list_styling_class}"> <li><b>Top-Down-Planung</b> um alle Projektaufgaben zu definieren. Dabei sind die Anfangs- und Enddaten eines Elternelements unabhängig von den Daten der Unteraufgaben.</li> <li><b>Vielseitige agile Boards</b> ermöglichen Ihnen die Erstellung eines Projektstrukturplans oder die Verteilung von Aufgaben auf Unterprojekte.</li> <li><b>Projektvorlagen</b> zur einfachen Erstellung neuer Projekte.</li> <li>Konfiguration der Projektseite ermöglicht ein besseres <b>Projektportfolio-Management.</b></li> </ul>
OpenProject 10.5 unterstützt nun das <b>BIM Collaboration Format (BCF)</b> – den offenen Standard für Ticketverfolgung in BIM Modellen.<br><br> <ul class="%{list_styling_class}"> <li>Einfach <b>BIM Tickets anlegen und verwalten</b> wie z. B. Konflikte, Anfragen und Fragen im interaktiven 3D-IFC-Viewer und <b>teilen der Informationen mit dem Projektteam.</b></li> <li>Integrieren Sie OpenProject mit Ihrer bevorzugten BIM Software mit der leistungsstarken <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>BCF XML-Dateien importieren und exportieren.</li> </ul>
label_activate: "Aktiviere"
label_add_column_after: "Spalte danach hinzufügen"
label_add_column_before: "Spalte davor hinzufügen"

@ -273,9 +273,9 @@ el:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Ενεργοποίηση"
label_add_column_after: "Προσθήκη στήλης μετά"
label_add_column_before: "Προσθήκη στήλης πριν"

@ -274,9 +274,9 @@ es:
current_new_feature_html: >
La versión contiene nuevas mejoras y características: <br> <ul class="%{list_styling_class}"> <li><b>Programación descendente</b> para definir todas las tareas del proyecto. Los elementos secundarios no afectan a las fechas de inicio y finalización del elemento principal.</li> <li>Los <b>paneles ágiles y versátiles</b> permiten crear una estructura de desglose del trabajo o distribuir las tareas entre subproyectos.</li> <li><b>Plantillas de proyecto</b> para crear fácilmente nuevos proyectos.</li> <li>La configuración de la página de proyectos permite <b>gestionar mejor la cartera de proyectos</b>.</li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
La versión contiene nuevas mejoras y características: <br> <ul class="%{list_styling_class}"> <li><b>Programación descendente</b> para definir todas las tareas del proyecto. Los elementos secundarios no afectan a las fechas de inicio y finalización del elemento principal.</li> <li>Los <b>paneles ágiles y versátiles</b> permiten crear una estructura de desglose del trabajo o distribuir las tareas entre subproyectos.</li> <li><b>Plantillas de proyecto</b> para crear fácilmente nuevos proyectos.</li> <li>La configuración de la página de proyectos permite <b>gestionar mejor la cartera de proyectos</b>.</li> </ul>
OpenProject 10.5 ahora es compatible con el <b>formato de colaboración BIM (BCF)</b>: el estándar de seguimiento de incidencias sin resolver para modelos BIM.<br><br> <ul class="%{list_styling_class}"> <li>Cree y gestione fácilmente <b>incidencias de BIM</b> (como conflictos, solicitudes y preguntas) en el modelo IFC 3D interactivo y <b>compártalas con el equipo del proyecto</b>.</li> <li>Integre OpenProject con su software de BIM favorito mediante la avanzada <a target="_blank" href="%{bcf_api_link}">API de REST de BCF</a>.</li> <li>Importe y exporte archivos XML de BCF.</li> </ul>
label_activate: "Activar"
label_add_column_after: "Añadir columna a la derecha"
label_add_column_before: "Añadir columna a la izquierda"

@ -274,9 +274,9 @@ fi:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivoi"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ fil:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktibo"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ fr:
current_new_feature_html: >
La version contient diverses nouvelles fonctionnalités et améliorations : <br> <ul class="%{list_styling_class}"> <li><b>Planification de haut en bas</b> pour définir toutes les tâches du projet impliquées. Les dates de début et de fin du parent ne sont pas affectées par ses enfants.</li> <li><b>Les planches agiles polyvalentes</b> vous permettent de créer une structure de répartition du travail ou de répartir les tâches entre les sous-projets.</li> <li><b>Modèle de projet</b> pour faciliter la création de nouveaux projets.</li> <li>Configuration de la page des projets permettant de mieux <b>gérer le portefeuille.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
La version contient diverses nouvelles fonctionnalités et améliorations : <br> <ul class="%{list_styling_class}"> <li><b>Planification de haut en bas</b> pour définir toutes les tâches du projet impliquées. Les dates de début et de fin du parent ne sont pas affectées par ses enfants.</li> <li><b>Les planches agiles polyvalentes</b> vous permettent de créer une structure de répartition du travail ou de répartir les tâches entre les sous-projets.</li> <li><b>Modèle de projet</b> pour faciliter la création de nouveaux projets.</li> <li>Configuration de la page des projets permettant de mieux <b>gérer le portefeuille.</b></li> </ul>
OpenProject 10.5 prend maintenant en charge le <b>BIM Collaboration Format (BCF)</b> – la norme ouverte de suivi des problèmes pour les modèles BIM.<br><br> <ul class="%{list_styling_class}"> <li>Créez et <b>gérez facilement les problèmes BIM</b> telles que les désaccords, demandes et questions dans le modèle interactif 3D IFC et <b>partager-ler avec l'équipe du projet.</b></li> <li>Intégrez OpenProject à votre logiciel BIM préféré en utilisant la puissante <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Importez et exportez des fichiers BCF XML.</li> </ul>
label_activate: "Activer"
label_add_column_after: "Ajouter une colonne après"
label_add_column_before: "Ajouter une colonne avant"

@ -274,9 +274,9 @@ hr:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktiviraj"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -273,9 +273,9 @@ hu:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivál"
label_add_column_after: "Oszlop hozzáadása utána"
label_add_column_before: "Oszlop hozzáadása előtte"

@ -274,9 +274,9 @@ id:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktifkan"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ it:
current_new_feature_html: >
Questa release contiene varie nuove funzionalità e miglioramenti: <br> <ul class="%{list_styling_class}"> <li><b>Pianificazione top-down</b> per definire tutte le attività di progetto coinvolte. Le date di inizio e di fine del genitore non sono influenzate dai suoi figli.</li> <li><b>Board Agile versatili</b> che consentono di creare una struttura di ripartizione del lavoro o di distribuire le attività tra sottoprogetti.</li> <li><b>Modelli di progetto</b> per una facile creazione di nuovi progetti.</li> <li>Configurazione della pagina dei progetti che consente una migliore <b>gestione del portafoglio dei progetti.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
Questa release contiene varie nuove funzionalità e miglioramenti: <br> <ul class="%{list_styling_class}"> <li><b>Pianificazione top-down</b> per definire tutte le attività di progetto coinvolte. Le date di inizio e di fine del genitore non sono influenzate dai suoi figli.</li> <li><b>Board Agile versatili</b> che consentono di creare una struttura di ripartizione del lavoro o di distribuire le attività tra sottoprogetti.</li> <li><b>Modelli di progetto</b> per una facile creazione di nuovi progetti.</li> <li>Configurazione della pagina dei progetti che consente una migliore <b>gestione del portafoglio dei progetti.</b></li> </ul>
OpenProject 10.5 ora supporta il <b>BIM Collaboration Format (BCF)</b>, lo standard di monitoraggio dei problemi aperti per i modelli BIM.<br><br> <ul class="%{list_styling_class}"> <li>Crea e <b>gestisci facilmente i problemi di BIM</b> come disaccordi, richieste e domande nel modello interattivo 3D IFC e <b>condividili con il team del progetto.</b></li> <li>Integra OpenProject con il tuo software BIM preferito utilizzando la <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Importa ed esporta file BCF XML.</li> </ul>
label_activate: "Attiva"
label_add_column_after: "Aggiungi colonna dopo"
label_add_column_before: "Aggiungi colonna prima"

@ -275,9 +275,9 @@ ja:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "有効にする"
label_add_column_after: "後に列を追加"
label_add_column_before: "前に列を追加"

@ -274,9 +274,9 @@ ko:
current_new_feature_html: >
이 릴리스에는 다음과 같은 여러 가지 새로운 기능과 개선된 기능이 포함되어 있습니다: <br> <ul class="%{list_styling_class}"> <li><b>하향식 스케줄링</b>으로 모든 관련 프로젝트 작업을 정의할 수 있습니다. 부모의 시작 날짜와 완료 날짜는 자식에 의해 영향을 받지 않습니다.</li> <li><b>다기능 애자일 보드</b>를 사용하여 작업 분류 구조를 만들거나 하위 프로젝트 간에 작업을 배포 할 수 있습니다.</li> <li><b>프로젝트 템플릿</b>으로 새 프로젝트를 손쉽게 만들 수 있습니다.</li> <li>프로젝트 페이지 구성을 통해 더욱 효과적으로 <b>프로젝트 포트폴리오 관리를 할 수 있습니다.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
이 릴리스에는 다음과 같은 여러 가지 새로운 기능과 개선된 기능이 포함되어 있습니다: <br> <ul class="%{list_styling_class}"> <li><b>하향식 스케줄링</b>으로 모든 관련 프로젝트 작업을 정의할 수 있습니다. 부모의 시작 날짜와 완료 날짜는 자식에 의해 영향을 받지 않습니다.</li> <li><b>다기능 애자일 보드</b>를 사용하여 작업 분류 구조를 만들거나 하위 프로젝트 간에 작업을 배포 할 수 있습니다.</li> <li><b>프로젝트 템플릿</b>으로 새 프로젝트를 손쉽게 만들 수 있습니다.</li> <li>프로젝트 페이지 구성을 통해 더욱 효과적으로 <b>프로젝트 포트폴리오 관리를 할 수 있습니다.</b></li> </ul>
이제 OpenProject 10.5는 BIM 모델에 대한 오픈 이슈 추적 표준인 <b>BIM Collaboration Format(BCF)</b>을 지원합니다.<br><br> <ul class="%{list_styling_class}"> <li>대화형 3D IFC 모델의 충돌, 요청, 질문 등 <b>BIM 이슈 관리</b> 및 생성을 손쉽게 하고 <b>프로젝트 팀과 공유</b>합니다.</li> <li>강력한 <a target="_blank" href="%{bcf_api_link}">BCF REST API</a>를 사용하여 원하는 BIM 소프트웨어와 OpenProject를 통합합니다.</li> <li>BCF XML 파일을 가져오고 내보냅니다.</li> </ul>
label_activate: "활성화"
label_add_column_after: "다음 뒤에 열 추가"
label_add_column_before: "다음 앞에 열 추가"

@ -274,9 +274,9 @@ lt:
current_new_feature_html: >
Šioje laidoje yra naujos galimybės ir patobulinimai: <br> <ul class="%{list_styling_class}"> <li><b>Planavimas iš viršaus į apačią</b> apibrėžia visas su projektu susijusias užduotis. Tėvinės užduoties pradžios ir pabaigos datų nebekeičia pakeitimai vaikinėse užduotyse.</li> <li><b>Universalios agile lentos</b> leidžia sukurti užduoties išdalinimo struktūrą arba paskirstyti užduotis į subprojektus.</li> <li><b>Projektų šablonai</b> lengvesniam naujų projektų kūrimui.</li> <li>Konfigūruojamas projektų puslapis, leidžiantis geresnį <b>projektų portfelio valdymą.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
Šioje laidoje yra naujos galimybės ir patobulinimai: <br> <ul class="%{list_styling_class}"> <li><b>Planavimas iš viršaus į apačią</b> apibrėžia visas su projektu susijusias užduotis. Tėvinės užduoties pradžios ir pabaigos datų nebekeičia pakeitimai vaikinėse užduotyse.</li> <li><b>Universalios agile lentos</b> leidžia sukurti užduoties išdalinimo struktūrą arba paskirstyti užduotis į subprojektus.</li> <li><b>Projektų šablonai</b> lengvesniam naujų projektų kūrimui.</li> <li>Konfigūruojamas projektų puslapis, leidžiantis geresnį <b>projektų portfelio valdymą.</b></li> </ul>
OpenProject 10.5 jau palaiko <b>BIM Collaboration Format (BCF)</b> – atvirą BIM modelių trūkumų valdymo standartą.<br><br> <ul class="%{list_styling_class}"> <li>Lengvai kurkite ir <b>valdykite BIM trūkumus</b> tokius kaip susikirtimai, užklausos ir klausimai interaktyviame 3D IFC modelyje ir <b>dalinkitės jais su projekto komanda.</b></li> <li>Integruokite OpenProject su jūsų pasirinkta BIM programine įranga naudodami galingą <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Importuokite ir eksportuokite BCF XML failus.</li> </ul>
label_activate: "Aktyvuoti"
label_add_column_after: "Pridėti stulpelį po"
label_add_column_before: "Pridėti stulpelį prieš"

@ -274,9 +274,9 @@ nl:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Activeren"
label_add_column_after: "Kolom toevoegen na"
label_add_column_before: "Kolom toevoegen voor"

@ -274,9 +274,9 @@
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktiver"
label_add_column_after: "Add column after"
label_add_column_before: "Add column before"

@ -274,9 +274,9 @@ pl:
current_new_feature_html: >
Wersja zawiera różne nowe funkcje i ulepszenia: <br> <ul class="%{list_styling_class}"> <li><b>Planowanie hierarchiczne</b> w celu zdefiniowania wszystkich zadań związanych z projektem. Daty rozpoczęcia i zakończenia elementu nadrzędnego nie mają wpływu na jego elementy podrzędne.</li> <li><b>Wszechstronne tablice zwinne</b> pozwalają na utworzenie struktury podziału pracy lub rozdzielanie zadań między podprojekty.</li> <li><b>Szablony projektów</b> ułatwiające tworzenie nowych projektów.</li> <li>Konfiguracja strony projektów umożliwiająca lepsze <b>zarządzanie portfelem projektów</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
Wersja zawiera różne nowe funkcje i ulepszenia: <br> <ul class="%{list_styling_class}"> <li><b>Planowanie hierarchiczne</b> w celu zdefiniowania wszystkich zadań związanych z projektem. Daty rozpoczęcia i zakończenia elementu nadrzędnego nie mają wpływu na jego elementy podrzędne.</li> <li><b>Wszechstronne tablice zwinne</b> pozwalają na utworzenie struktury podziału pracy lub rozdzielanie zadań między podprojekty.</li> <li><b>Szablony projektów</b> ułatwiające tworzenie nowych projektów.</li> <li>Konfiguracja strony projektów umożliwiająca lepsze <b>zarządzanie portfelem projektów</b></li> </ul>
OpenProject 10.5 obsługuje teraz <b>BIM Collaboration Format (BCF)</b> – standard śledzenia otwartych problemów dla modeli BIM.<br><br> <ul class="%{list_styling_class}"> <li>Z łatwością twórz i <b>zarządzaj problemami BIM</b>, takimi jak kolizje, żądania i pytania w interaktywnym modelu 3D IFC i <b>udostępniaj je zespołowi projektowemu.</b></li> <li>Zintegruj OpenProject z ulubionym oprogramowaniem BIM za pomocą wszechstronnego <a target="_blank" href="%{bcf_api_link}">interfejsu API BCF REST.</a></li> <li>Importuj i eksportuj pliki BCF w formacie XML.</li> </ul>
label_activate: "Aktywuj"
label_add_column_after: "Dodaj kolumnę po"
label_add_column_before: "Dodaj kolumnę przed"

@ -273,9 +273,9 @@ pt:
current_new_feature_html: >
A liberação possui vários novos recursos e melhorias: <br> <ul class="%{list_styling_class}"> <li><b>Agendamento suspenso</b> para definir todas as tarefas de projeto envolvidas. As datas de início e término do pai não são afetadas por seu filho.</li> <li><b>Painéis versáteis e ágeis</b> permitem que você crie uma estrutura de divisão de trabalho ou para distribuir tarefas entre subprojetos.</li> <li><b>Modelos de projeto</b> para uma criação mais fácil de novos projetos.</li> <li>Configuração da página de projetos que permite uma melhor <b>gestão de portfólio de projeto.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
A liberação possui vários novos recursos e melhorias: <br> <ul class="%{list_styling_class}"> <li><b>Agendamento suspenso</b> para definir todas as tarefas de projeto envolvidas. As datas de início e término do pai não são afetadas por seu filho.</li> <li><b>Painéis versáteis e ágeis</b> permitem que você crie uma estrutura de divisão de trabalho ou para distribuir tarefas entre subprojetos.</li> <li><b>Modelos de projeto</b> para uma criação mais fácil de novos projetos.</li> <li>Configuração da página de projetos que permite uma melhor <b>gestão de portfólio de projeto.</b></li> </ul>
O OpenProject 10.5 agora dá suporte ao <b>BIM Colaboration Format (BCF)</b> - o padrão de rastreio de casos abertos para modelos BIM.<br><br> <ul class="%{list_styling_class}"> <li>Crie e <b>gerencie com facilidade os problemas do BIM,</b> tais como conflitos, solicitações e perguntas no modelo interativo de IFC 3D e <b>compartilhe com a equipa do projeto.</b></li> <li>Integre o OpenProject em seu software BIM favorito através do poderoso <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Importe e exporte arquivos XML BCF.</li> </ul>
label_activate: "Ativar"
label_add_column_after: "Adicionar coluna depois"
label_add_column_before: "Adicionar coluna antes"

@ -273,9 +273,9 @@ ro:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Activare"
label_add_column_after: "Adauga o coloana dupa"
label_add_column_before: "Adauga o coloana inainte"

@ -273,9 +273,9 @@ ru:
current_new_feature_html: >
Релиз содержит различные новые особенности и улучшения: <br> <ul class="%{list_styling_class}"> <li><b>Планирование сверху-вниз</b> для определения всех связанных с проектом задач. Даты начала и окончания родительского процесса не зависят от его дочерних элементов.</li> <li><b>Универсальные agile-доски</b> позволяют создавать структуру разбивки работ или распределять задачи между подпроектами.</li> <li><b>Шаблоны проектов</b> для легкого создания новых проектов.</li> <li>Конфигурация страницы проектов позволяет улучшить <b>управление портфелем проектов.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
Релиз содержит различные новые особенности и улучшения: <br> <ul class="%{list_styling_class}"> <li><b>Планирование сверху-вниз</b> для определения всех связанных с проектом задач. Даты начала и окончания родительского процесса не зависят от его дочерних элементов.</li> <li><b>Универсальные agile-доски</b> позволяют создавать структуру разбивки работ или распределять задачи между подпроектами.</li> <li><b>Шаблоны проектов</b> для легкого создания новых проектов.</li> <li>Конфигурация страницы проектов позволяет улучшить <b>управление портфелем проектов.</b></li> </ul>
OpenProject 10.5 теперь поддерживает <b>BIM (BCF)</b> формат сотрудничества – стандарт открытого отслеживания ошибок для моделей BIM.<br><br> <ul class="%{list_styling_class}"> <li>Легко создавайте и <b>управляйте выпусками BIM</b> , такими как столкновения, запросы и вопросы в интерактивной 3D-модели IFC и <b>делитесь ими с командой проекта.</b></li> <li>Интегрируйте OpenProject со своим программным обеспечением BIM, используя мощный <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Импортируйте и экспортируйте BCF XML-файлы</li> </ul>
label_activate: "Активировать"
label_add_column_after: "Добавить столбец после"
label_add_column_before: "Добавить столбец перед"

@ -274,9 +274,9 @@ sk:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivovať"
label_add_column_after: "Pridať stĺpec po"
label_add_column_before: "Pridať stĺpec pred"

@ -273,9 +273,9 @@ sl:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 zdaj podpira <b> BIM Format sodelovanja (BCF) </b> - standard za sledenje odprtih vprašanj za modele BIM.<br><br> <ul class="%{list_styling_class}"> <li>Preprosto ustvarite in <b> upravljajte težave BIM </b>, kot so spopadi, zahteve in vprašanja v interaktivnem 3D-IFC modelu in ga <b> dajte v skupno rabo s projektno skupino. </b> </li> <li> Integracija OpenProject z vašo najljubšo programsko opremo BIM z uporabo zmogljive <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Uvozite in izvozite BCF XML datoteke.</li> </ul>
label_activate: "Aktiviraj"
label_add_column_after: "Dodaj stolpec za"
label_add_column_before: "Dodaj stolpec pred"

@ -273,9 +273,9 @@ sv:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Aktivera"
label_add_column_after: "Lägg till kolumn efter"
label_add_column_before: "Lägg till kolumn före"

@ -274,9 +274,9 @@ tr:
current_new_feature_html: >
Sürüm, çeşitli yeni özellikler ve iyileştirmeler içerir: <br> <ul class="%{list_styling_class}"> <li><b> İlgili tüm proje görevlerini tanımlamak için <b> yukarıdan aşağıya planlama </b>. Ebeveynin başlangıç ve bitiş tarihleri, çocuklarından etkilenmez. </li> <li> <b> Çok yönlü çevik panolar </b>, bir iş kırılım yapısı oluşturmanıza veya görevleri alt projeler arasında dağıtmanıza olanak tanır. </li> <li> Yeni projelerin kolayca oluşturulması için <b> proje şablonları </b>. </li> <li> Daha iyi <b> proje portföy yönetimi </b> sağlayan projeler sayfasının yapılandırılması. </li> </ ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
Sürüm, çeşitli yeni özellikler ve iyileştirmeler içerir: <br> <ul class="%{list_styling_class}"> <li><b> İlgili tüm proje görevlerini tanımlamak için <b> yukarıdan aşağıya planlama </b>. Ebeveynin başlangıç ve bitiş tarihleri, çocuklarından etkilenmez. </li> <li> <b> Çok yönlü çevik panolar </b>, bir iş kırılım yapısı oluşturmanıza veya görevleri alt projeler arasında dağıtmanıza olanak tanır. </li> <li> Yeni projelerin kolayca oluşturulması için <b> proje şablonları </b>. </li> <li> Daha iyi <b> proje portföy yönetimi </b> sağlayan projeler sayfasının yapılandırılması. </li> </ ul>
OpenProject 10.5 artık BIM modelleri için açık sorun izleme standardı olan <b> BIM İşbirliği Formatını (BCF) </b> desteklemektedir. <br> <br> <ul class = "%{list_styling_class}">"> <li> Kolayca oluşturun ve etkileşimli 3D IFC modelindeki çakışmalar, istekler ve sorular gibi <b> BIM sorunlarını yönetin </b> ve <b> proje ekibiyle paylaşın. </b> </li> <li> OpenProject'i güçlü <a target="_blank" href="%{bcf_api_link}"> BCF REST API'sini kullanarak favori BIM yazılımı. </a> </li> <li> BCF XML dosyalarını içe ve dışa aktarın. </li> </ ul>
label_activate: "Etkinleştir"
label_add_column_after: "Sonrasına sütun ekle"
label_add_column_before: "Öncesine sütun ekle"

@ -274,9 +274,9 @@ uk:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Активувати"
label_add_column_after: "Додати стовпець після"
label_add_column_before: "Додати стовпець перед"

@ -273,9 +273,9 @@ vi:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "Activate"
label_add_column_after: "Thêm cột phía sau"
label_add_column_before: "Thêm cột phía trước"

@ -274,9 +274,9 @@ zh-CN:
current_new_feature_html: >
此版本包含许多新功能和改进:<br> <ul class="%{list_styling_class}"> <li><b>自上而下的计划</b>,可定义所有涉及的项目任务。父项的开始和结束日期不受其子项的影响。</li> <li><b>多功能敏捷板</b>,允许您创建一个工作细分结构或在子项目之间分配任务。</li> <li><b>项目模板</b>,可轻松创建新项目。</li> <li>可配置项目页面,从而能够更好地<b>管理项目组合</b>。</li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
此版本包含许多新功能和改进:<br> <ul class="%{list_styling_class}"> <li><b>自上而下的计划</b>,可定义所有涉及的项目任务。父项的开始和结束日期不受其子项的影响。</li> <li><b>多功能敏捷板</b>,允许您创建一个工作细分结构或在子项目之间分配任务。</li> <li><b>项目模板</b>,可轻松创建新项目。</li> <li>可配置项目页面,从而能够更好地<b>管理项目组合</b>。</li> </ul>
OpenProject 10.5 现在支持 <b>BIM Collaboration Format (BCF)</b> - BIM 模型的开放式问题跟踪标准。<br><br> <ul> <ul class="%{list_styling_class}"> <li>轻松创建并<b>管理 BIM 问题</b>(如交互式 3D IFC 模型中的冲突、请求和问题),并<b>与项目团队共享</b>。</li> <li>使用强大的 <a target="_blank" href="%{bcf_api_link}">BCF REST API</a> 将 OpenProject 与您最喜欢的 BIM 软件集成。</li> <li>导入和导出 BCF XML 文件。</li> </ul>
label_activate: "激活"
label_add_column_after: "之后添加列"
label_add_column_before: "在之前添加列"

@ -273,9 +273,9 @@ zh-TW:
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
bim:
learn_about_link: https://www.openproject.org/openproject-11-0-release
learn_about_link: https://www.openproject.org/openproject-bim-10-5
current_new_feature_html: >
The release contains various new features and improvements: <br> <ul class="%{list_styling_class}"> <li><b>Top-down scheduling</b> to define all project tasks involved. The start and finish dates of the parent are unaffected by its children.</li> <li><b>Versatile agile boards</b> allow you to create a work breakdown structure or to distribute tasks between subprojects.</li> <li><b>Project templates</b> for easy creation of new projects.</li> <li>Configuration of the projects page enabling better <b>project portfolio management.</b></li> </ul>
OpenProject 10.5 now supports the <b>BIM Collaboration Format (BCF)</b> – the open issue tracking standard for BIM models.<br><br> <ul class="%{list_styling_class}"> <li>Easily create and <b>manage BIM issues</b> such as clashes, requests and questions in the interactive 3D IFC model and <b>share it with the project team.</b></li> <li>Integrate OpenProject with your favorite BIM software using the powerful <a target="_blank" href="%{bcf_api_link}">BCF REST API.</a></li> <li>Import and export BCF XML files.</li> </ul>
label_activate: "啟用"
label_add_column_after: "在後面增加一欄"
label_add_column_before: "在前面增加一欄"

@ -50,7 +50,7 @@ ar:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ bg:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ ca:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ cs:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ da:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ de:
action_text_assignee: >
Board mit dynamischen Spalten auf zugewiesene Nutzer von Arbeitspaketen. Ideal für die Verteilung von Aufgaben.
action_text_version: >
Board mit dynamischen Spalten, das auf dem Versions-Attribut basiert. Ideal für die Planung von Software-Releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: Zugewiesen an
status: Status

@ -50,7 +50,7 @@ el:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: κατάσταση

@ -50,7 +50,7 @@ es:
action_text_assignee: >
Panel con columnas automáticas basadas en los usuarios asignados. Ideal para enviar paquetes de trabajo.
action_text_version: >
Panel con columnas automáticas basadas en el atributo de versión. Ideal para planificar versiones de software.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: asignado
status: estado

@ -50,7 +50,7 @@ fi:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ fil:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ fr:
action_text_assignee: >
Tableau avec colonnes automatisées basées sur des utilisateurs assignés. Idéal pour envoyer des lots de travaux.
action_text_version: >
Tableau avec colonnes automatiques basées sur l'attribut de version. Idéal pour la planification des versions de logiciels.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: responsable
status: état

@ -50,7 +50,7 @@ hr:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ hu:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ id:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ it:
action_text_assignee: >
Board con colonne automatizzate in base agli utenti assegnati. Ideale per l'assegnazione di macro-attività.
action_text_version: >
Scheda con colonne automatizzate in base all'attributo versione. Ideale per la pianificazione dei rilasci di software.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assegnatario
status: stato

@ -50,7 +50,7 @@ ja:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ ko:
action_text_assignee: >
할당된 사용자에 기반한 자동화된 열이 있는 보드입니다. 작업 패키지 디스패치에 적합합니다.
action_text_version: >
버전 특성에 기반한 자동화된 열이 있는 보드입니다. 소프트웨어 릴리스 계획에 적합합니다.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: 담당자
status: 상태

@ -50,7 +50,7 @@ lt:
action_text_assignee: >
Lenta su automatiniais stulpeliais pagrįstais priskirtu vartotoju. Ideali darbo paketų paskirstymui.
action_text_version: >
Lenta su automatiniais stulpeliais, pagrįstais versijos atributu. Ideali programinės įrangos laidų planavimui.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: paskirtas
status: būsena

@ -50,7 +50,7 @@ nl:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ pl:
action_text_assignee: >
Tablica z zautomatyzowanymi kolumnami odpowiadającymi przypisanym użytkownikom. Idealna do rozsyłania pakietów roboczych.
action_text_version: >
Tablica z zautomatyzowanymi kolumnami odpowiadającymi atrybutowi wersji. Idealna do planowania wydań oprogramowania.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: przypisana osoba
status: status

@ -50,7 +50,7 @@ pt:
action_text_assignee: >
Quadro com colunas automatizadas com base nos usuários designados. Ideal para despacho de pacotes de trabalho.
action_text_version: >
Quadros com colunas automatizadas com base no atributo de versão. Ideal para planejar lançamentos de software.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: responsável
status: estado

@ -50,7 +50,7 @@ ro:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ ru:
action_text_assignee: >
Форум с автоматическими колонками на основе назначенных пользователей. Идеально подходит для отправки пакетов работ.
action_text_version: >
Форум с автоматическими колонками на основе атрибутов версии, идеально подходит для планирования выпусков программного обеспечения.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: правопреемник
status: статус

@ -50,7 +50,7 @@ sk:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ sl:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: Pooblaščenec
status: Stanje

@ -50,7 +50,7 @@ sv:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ tr:
action_text_assignee: >
Atanan kullanıcılara göre otomatik sütunlara sahip pano. İş paketlerini göndermek için ideal.
action_text_version: >
Sürüm özelliğine göre otomatik sütunlara sahip pano. Yazılım sürümlerini planlamak için idealdir.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: vekil
status: durum

@ -50,7 +50,7 @@ uk:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -50,7 +50,7 @@ vi:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: Người được giao
status: Trạng thái

@ -50,7 +50,7 @@ zh-CN:
action_text_assignee: >
具有基于指定用户的自动列的面板。适合分发工作包。
action_text_version: >
具有基于版本属性的自动列的面板。适合规划软件版本。
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: 指派人
status: 状态

@ -50,7 +50,7 @@ zh-TW:
action_text_assignee: >
Board with automated columns based on assigned users. Ideal for dispatching work packages.
action_text_version: >
Board with automated columns based on the version attribute. Ideal for planning software releases.
Board with automated columns based on the version attribute. Ideal for planning product development.
action_type:
assignee: assignee
status: status

@ -60,17 +60,6 @@ ar:
label_units: "الوحدات"
label_week_reporting: "الأسبوع (قضى)"
label_year_reporting: "السنة (قضت)"
label_count: "العد"
label_filter: "فلترة"
label_filter_add: "إضافة عامل تصفية"
label_filter_plural: "عوامل التصفية"
label_group_by: "مجموعة من"
label_group_by_add: "أضِف مجموعة بحسب السّمة"
label_inactive: "<<غير فعّال>>"
label_no: "لا"
label_none: "(لا توجد بيانات)"
label_report: "تقرير"
label_yes: "نعم"
load_query_question: "سيكون للتقرير %{size} من خلايا الجدول، وقد يستغرق بعض الوقت للتقديم. هل ما زلت تريد المحاولة لتقديمه؟"
permission_save_cost_reports: "احفظ تقارير التكلفة العامة"
permission_save_private_cost_reports: "احفظ تقارير التكلفة الخاصة"
@ -80,7 +69,3 @@ ar:
units: "الوحدات"
validation_failure_date: "ليس تاريخًا صالحًا"
validation_failure_integer: "ليس عددًا صحيحًا صالحًا"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ bg:
label_units: "Units"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Count"
label_filter: "Филтър"
label_filter_add: "Add Filter"
label_filter_plural: "Филтри"
label_group_by: "Групиране по"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "Не"
label_none: "(no data)"
label_report: "Отчет"
label_yes: "Да"
load_query_question: "Report will have %{size} table cells and may take some time to render. Do you still want to try rendering it?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@ bg:
units: "Units"
validation_failure_date: "is not a valid date"
validation_failure_integer: "is not a valid integer"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ ca:
label_units: "Unitats"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Recompte"
label_filter: "Filtre"
label_filter_add: "Afegir filtre"
label_filter_plural: "Filtres"
label_group_by: "Agrupa per"
label_group_by_add: "Afegir grup per atribut"
label_inactive: "«inactiu»"
label_no: "No"
label_none: "(no hi ha dades)"
label_report: "Informe"
label_yes: "Sí"
load_query_question: "L'informe tindrà %{size} de cel·les i pot trigar algun temps per generar-se. Encara voleu intentar la generació?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@ ca:
units: "Unitats"
validation_failure_date: "no és una data vàlida"
validation_failure_integer: "no és un enter vàlid"
reporting:
group_by:
selected_columns: "Columnes seleccionades"
selected_rows: "Files seleccionades"

@ -60,17 +60,6 @@ cs:
label_units: "Jednotky"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Počet"
label_filter: "Filtr"
label_filter_add: "Přidat filtr"
label_filter_plural: "Filtry"
label_group_by: "Seskupit podle"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "Ne"
label_none: "(žádná data)"
label_report: "Hlášení"
label_yes: "Ano"
load_query_question: "Report will have %{size} table cells and may take some time to render. Do you still want to try rendering it?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@ cs:
units: "Jednotky"
validation_failure_date: "není platné datum"
validation_failure_integer: "není platné číslo"
reporting:
group_by:
selected_columns: "Vybrané sloupce"
selected_rows: "Vybrané řádky"

@ -60,17 +60,6 @@ da:
label_units: "Enheder"
label_week_reporting: "Uge (Brugt)"
label_year_reporting: "År (Brugt)"
label_count: "Antal"
label_filter: "Filter"
label_filter_add: "Tilføj filter"
label_filter_plural: "Filtre"
label_group_by: "Gruppér efter"
label_group_by_add: "Tilføj Gruppér efter-attribut"
label_inactive: "«inaktiv»"
label_no: "Nej"
label_none: "(ingen data)"
label_report: "Rapport"
label_yes: "Ja"
load_query_question: "Rapporten vil indeholde %{size} celler og kan tage nogen tid at danne. Fortsæt alligevel?"
permission_save_cost_reports: "Gem offentlig omkostningsrapport"
permission_save_private_cost_reports: "Gem privat omkostningsrapport"
@ -80,7 +69,3 @@ da:
units: "Enheder"
validation_failure_date: "er en ugyldig dato"
validation_failure_integer: "er et ugyldigt heltal"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ de:
label_units: "Einheiten"
label_week_reporting: "Woche der Buchung"
label_year_reporting: "Jahr der Buchung"
label_count: "Anzahl"
label_filter: "Filter"
label_filter_add: "Filter hinzufügen"
label_filter_plural: "Filter"
label_group_by: "Gruppiere Ergebnisse"
label_group_by_add: "Gruppierung hinzufügen"
label_inactive: "«nicht aktiviert»"
label_no: "Nein"
label_none: "(Keine Angabe)"
label_report: "Report"
label_yes: "Ja"
load_query_question: "Der Report wird %{size} Tabellen-Zellen haben, was sehr rechenintensiv sein kann. Wollen Sie dennoch versuchen, den Report durch zu führen?"
permission_save_cost_reports: "Speichern gemeinsamer Kostenauswertungen"
permission_save_private_cost_reports: "Speichern persönlicher Kostenauswertungen"
@ -80,7 +69,3 @@ de:
units: "Einheiten"
validation_failure_date: "ist kein gültiges Datum"
validation_failure_integer: "ist keine ganze Zahl"
reporting:
group_by:
selected_columns: "Ausgewählte Spalten"
selected_rows: "Ausgewählte Zeilen"

@ -60,17 +60,6 @@ el:
label_units: "Μονάδες"
label_week_reporting: "Εβδομάδα (Δαπανήθηκε)"
label_year_reporting: "Έτος (Δαπανήθηκε)"
label_count: "Πλήθος"
label_filter: "Φίλτρο"
label_filter_add: "Προσθήκη Φίλτρου"
label_filter_plural: "Φίλτρα"
label_group_by: "Ομαδοποίηση κατά"
label_group_by_add: "Προσθήκη χαρακτηριστικού Ομαδοποίησης-κατά"
label_inactive: "«αδρανές»"
label_no: "Όχι"
label_none: "(δεν υπάρχουν δεδομένα)"
label_report: "Αναφορά"
label_yes: "Ναι"
load_query_question: "Η αναφορά θα έχει %{size} κελιά πίνακα και μπορεί να πάρει κάποιο χρόνο για να γίνει. Θέλετε ακόμα να δοκιμάσετε την απόδοση;"
permission_save_cost_reports: "Αποθήκευση δημόσιων αναφορών κόστους"
permission_save_private_cost_reports: "Αποθήκευση ιδιωτικών αναφορών κόστους"
@ -80,7 +69,3 @@ el:
units: "Μονάδες"
validation_failure_date: "δεν είναι έγκυρη ημερομηνία"
validation_failure_integer: "δεν είναι έγκυρος ακέραιος αριθμός"
reporting:
group_by:
selected_columns: "Επιλεγμένες στήλες"
selected_rows: "Επιλεγμένες σειρές"

@ -60,17 +60,6 @@ es:
label_units: "Unidades"
label_week_reporting: "Semana (pasada)"
label_year_reporting: "Año (pasado)"
label_count: "Contador"
label_filter: "Filtro"
label_filter_add: "Añadir filtro"
label_filter_plural: "Filtros"
label_group_by: "Agrupar por"
label_group_by_add: "Añadir atributo de agrupación"
label_inactive: "«inactivo»"
label_no: "No"
label_none: "(sin datos)"
label_report: "Informe"
label_yes: "Sí"
load_query_question: "El informe tendrá %{size} celdas de tabla y puede tardar algún tiempo en generarse. ¿Desea generarlo de todas formas?"
permission_save_cost_reports: "Guardar informes de costos públicos"
permission_save_private_cost_reports: "Guardar informes de costos privados"
@ -80,7 +69,3 @@ es:
units: "Unidades"
validation_failure_date: "no es una fecha válida"
validation_failure_integer: "no es un entero válido"
reporting:
group_by:
selected_columns: "Columnas seleccionadas"
selected_rows: "Filas seleccionadas"

@ -60,17 +60,6 @@ fi:
label_units: "Yksiköt"
label_week_reporting: "Viikko (käytetty)"
label_year_reporting: "Vuosi (käytetty)"
label_count: "Määrä"
label_filter: "Suodata"
label_filter_add: "Lisää suodatin"
label_filter_plural: "Suodattimet"
label_group_by: "Ryhmittely"
label_group_by_add: "Lisää ryhmittely-valinta"
label_inactive: "«passiivinen»"
label_no: "Ei"
label_none: "(ei tietoja)"
label_report: "Raportti"
label_yes: "Kyllä"
load_query_question: "Raportissa tulee olemaan %{size} solua ja sen luominen voi kentää jonkin aikaa. Haluatko silti kokeilla sen luomista?"
permission_save_cost_reports: "Tallenna julkiset kustannusraportit"
permission_save_private_cost_reports: "Tallenna yksityiset kustannusraportit"
@ -80,7 +69,3 @@ fi:
units: "Yksiköt"
validation_failure_date: "ei ole kelvollinen päivämäärä"
validation_failure_integer: "ei ole kelvollinen kokonaisluku"
reporting:
group_by:
selected_columns: "Valitut sarakkeet"
selected_rows: "Valitut rivit"

@ -60,17 +60,6 @@ fil:
label_units: "Units"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Count"
label_filter: "Salain"
label_filter_add: "Add Filter"
label_filter_plural: "Mga nasala"
label_group_by: "Pangkat sa"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "Hindi"
label_none: "(no data)"
label_report: "Ulat"
label_yes: "Oo"
load_query_question: "Report will have %{size} table cells and may take some time to render. Do you still want to try rendering it?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@ fil:
units: "Units"
validation_failure_date: "is not a valid date"
validation_failure_integer: "is not a valid integer"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ fr:
label_units: "Unités"
label_week_reporting: "Semaine (passée)"
label_year_reporting: "Année (passée)"
label_count: "Décompte"
label_filter: "Filtrer"
label_filter_add: "Ajouter un filtre"
label_filter_plural: "Filtres"
label_group_by: "Grouper par"
label_group_by_add: "Ajoutez l'attribut \"Grouper par\""
label_inactive: "« inactif »"
label_no: "Non"
label_none: "(aucune donnée)"
label_report: "Rapport"
label_yes: "Oui"
load_query_question: "Le rapport contiendra un tableau de %{size} cellules et peut prendre un certain temps à être généré. Voulez-vous quand même le générer ?"
permission_save_cost_reports: "Enregistrer des rapports publics de coûts"
permission_save_private_cost_reports: "Enregistrer des rapports privés de coûts"
@ -80,7 +69,3 @@ fr:
units: "Unités"
validation_failure_date: "n'est pas une date valide"
validation_failure_integer: "n'est pas un nombre entier valide"
reporting:
group_by:
selected_columns: "Colonnes sélectionnées"
selected_rows: "Lignes sélectionnées"

@ -60,17 +60,6 @@ hr:
label_units: "Jedinice"
label_week_reporting: "Tjedan (utrošeno)"
label_year_reporting: "Godine (utrošeno)"
label_count: "Zbroji"
label_filter: "Filter"
label_filter_add: "Dodaj filter"
label_filter_plural: "Filteri"
label_group_by: "Grupiraj po"
label_group_by_add: "Dodaj grupu - po Atributu"
label_inactive: "«neaktivan»"
label_no: "Ne"
label_none: "(nema podataka)"
label_report: "Izvješće"
label_yes: "Da"
load_query_question: "Izvješće će imati %{size} veličinu tablice te će biti potrebno određeno vrijeme za prikaz. Da li želite prikazati ga i dalje?"
permission_save_cost_reports: "Spremi izvješća javnog troška"
permission_save_private_cost_reports: "Spremi izvješća privatnog troška"
@ -80,7 +69,3 @@ hr:
units: "Jedinice"
validation_failure_date: "nije valjan datum"
validation_failure_integer: "nije valjan cijeli broj"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ hu:
label_units: "Egységek"
label_week_reporting: "Hét (eltöltött)"
label_year_reporting: "Év (eltöltött)"
label_count: "Darabszám"
label_filter: "Szűrő"
label_filter_add: "Szűrő hozzáadása"
label_filter_plural: "Szürő"
label_group_by: "Csoportosítás"
label_group_by_add: "Csoportosítási tulajdonság hozzáadása"
label_inactive: "«inaktív»"
label_no: "Nem"
label_none: "(nincs adat)"
label_report: "Jelentés"
label_yes: "Igen"
load_query_question: "A jelentés %{size} cellát fog tartalmazni, így eltarthat egy ideig az elkészítése. Továbbra is el szeretné készíteni?"
permission_save_cost_reports: "Nyilvános költség jelentés mentése"
permission_save_private_cost_reports: "Privát költség jelentés mentése"
@ -80,7 +69,3 @@ hu:
units: "Egységek"
validation_failure_date: "nem érvényes dátum"
validation_failure_integer: "nem érvényes egész szám"
reporting:
group_by:
selected_columns: "A kijelölt oszlopok"
selected_rows: "A kijelölt sorok"

@ -60,17 +60,6 @@ id:
label_units: "Unit"
label_week_reporting: "Minggu (spent)"
label_year_reporting: "Tahun (Spent)"
label_count: "Count"
label_filter: "Filter"
label_filter_add: "Add Filter"
label_filter_plural: "Filter"
label_group_by: "Pengelompokan"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "No"
label_none: "(no data)"
label_report: "Laporan"
label_yes: "Yes"
load_query_question: "Proses laporan memiliki %{size} cell dan akan memakan waktu yang relatif lama. Apakah anda ingin melanjutkan?"
permission_save_cost_reports: "Simpan laporan biaya untuk umum"
permission_save_private_cost_reports: "Simpan laporan biaya untuk diri sendiri"
@ -80,7 +69,3 @@ id:
units: "Unit"
validation_failure_date: "validasi tanggal gagal"
validation_failure_integer: "validasi bilangan bulat gagal"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ it:
label_units: "Unità di misura"
label_week_reporting: "Settimana (passato)"
label_year_reporting: "Anno (passato)"
label_count: "Conteggio"
label_filter: "Filtro"
label_filter_add: "Aggiungi filtro"
label_filter_plural: "Filtri"
label_group_by: "Raggruppa per"
label_group_by_add: "Aggiungi l'attributo Group-by"
label_inactive: "«inattivo»"
label_no: "No"
label_none: "(nessun dato)"
label_report: "Segnalano"
label_yes: "Si"
load_query_question: "Il report avrà le celle della tabella del %{size} e potrebbe essere necessario del tempo per eseguire il rendering. Vuoi ancora tentare di eseguirne il rendering?"
permission_save_cost_reports: "Salva il report costi pubblici"
permission_save_private_cost_reports: "Salvare il report costi privati"
@ -80,7 +69,3 @@ it:
units: "Unità di misura"
validation_failure_date: "non è una data valida"
validation_failure_integer: "non è un numero intero valido"
reporting:
group_by:
selected_columns: "Colonne selezionate"
selected_rows: "Righe selezionate"

@ -60,17 +60,6 @@ ja:
label_units: "単位"
label_week_reporting: "週 (経過)"
label_year_reporting: "年 (経過)"
label_count: "回数"
label_filter: "フィルタ"
label_filter_add: "フィルタを追加"
label_filter_plural: "フィルタ"
label_group_by: "グループ化"
label_group_by_add: "グループ化属性を追加"
label_inactive: "«非活動»"
label_no: "いいえ"
label_none: "(データなし)"
label_report: "レポート"
label_yes: "はい"
load_query_question: "レポートは%{size}つセルを持つために、描画するに時間がかかる場合があります。描画してもよろしいですか?"
permission_save_cost_reports: "共有コストレポートを保存"
permission_save_private_cost_reports: "マイコストレポートを保存"
@ -80,7 +69,3 @@ ja:
units: "単位"
validation_failure_date: "は有効な日付ではありません。"
validation_failure_integer: "は有効な整数ではありません。"
reporting:
group_by:
selected_columns: "選択された列"
selected_rows: "選択された行"

@ -60,17 +60,6 @@ ko:
label_units: "단위"
label_week_reporting: "주(소비)"
label_year_reporting: "년(소비)"
label_count: "카운트"
label_filter: "필터"
label_filter_add: "필터 추가"
label_filter_plural: "필터"
label_group_by: "그룹화 기준"
label_group_by_add: "그룹화 기준 특성 추가"
label_inactive: "«비활성»"
label_no: "아니요"
label_none: "(데이터 없음)"
label_report: "보고서"
label_yes: "예"
load_query_question: "보고서에는 %{size}개 테이블 셀이 있고 렌더링하는 데 시간이 걸릴 수 있습니다. 렌더링하시겠습니까?"
permission_save_cost_reports: "공용 비용 보고서 저장"
permission_save_private_cost_reports: "비공개 비용 보고서 저장"
@ -80,7 +69,3 @@ ko:
units: "단위"
validation_failure_date: "은(는) 유효한 날짜가 아닙니다."
validation_failure_integer: "은(는) 유효한 정수가 아닙니다."
reporting:
group_by:
selected_columns: "선택된 열"
selected_rows: "선택된 행"

@ -60,17 +60,6 @@ lt:
label_units: "Vienetai"
label_week_reporting: "Savaitė (praleista)"
label_year_reporting: "Metai (praleista)"
label_count: "Skaičius"
label_filter: "Filtras"
label_filter_add: "Pridėti filtrą"
label_filter_plural: "Filtrai"
label_group_by: "Grupuoti pagal"
label_group_by_add: "Pridėti grupavimą pagal atributą"
label_inactive: "«neaktyvus»"
label_no: "Ne"
label_none: "(nėra duomenų)"
label_report: "Ataskaita"
label_yes: "Taip"
load_query_question: "Ataskaita turės %{size} lentelės langelių ir gali užtrukti, kol bus paruošta. Ar Jūs dar vis norite pabandyti sukurti ją?"
permission_save_cost_reports: "Išsaugoti viešų kaštų ataskaitas"
permission_save_private_cost_reports: "Išsaugoti privačių kaštų ataskaitas"
@ -80,7 +69,3 @@ lt:
units: "Vienetai"
validation_failure_date: "nėra tinkama data"
validation_failure_integer: "nėra tinkamas sveikas skaičius"
reporting:
group_by:
selected_columns: "Pasirinkti stulpeliai"
selected_rows: "Pasirinktos eilutės"

@ -60,17 +60,6 @@ nl:
label_units: "Eenheden"
label_week_reporting: "Week (kosten)"
label_year_reporting: "Jaar (kosten)"
label_count: "Aantal"
label_filter: "Filter"
label_filter_add: "Filter Toevoegen"
label_filter_plural: "Filters"
label_group_by: "Groeperen op"
label_group_by_add: "Groep, toevoegen aan Attribuut"
label_inactive: "«inactief»"
label_no: "Nee"
label_none: "(geen gegevens)"
label_report: "Rapport"
label_yes: "Ja"
load_query_question: "Het rapport bevat %{size} tabelcellen en kan enige tijd kosten om te renderen. Wilt u proberen het rapport toch uit te voeren?"
permission_save_cost_reports: "Bewaar publiek kostenrapporten"
permission_save_private_cost_reports: "Bewaar privé kostenrapporten"
@ -80,7 +69,3 @@ nl:
units: "Eenheden"
validation_failure_date: "is geen geldige datum"
validation_failure_integer: "is geen geldig geheel getal"
reporting:
group_by:
selected_columns: "Geselecteerde kolommen"
selected_rows: "Geselecteerde rijen"

@ -60,17 +60,6 @@
label_units: "Enheter"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Antall"
label_filter: "Filter"
label_filter_add: "Legg til Filter"
label_filter_plural: "Filtre"
label_group_by: "Grupper etter"
label_group_by_add: "Legg grupper etter attributt"
label_inactive: "«inaktiv»"
label_no: "Nei"
label_none: "(ingen data)"
label_report: "Rapport"
label_yes: "Ja"
load_query_question: "Rapporten vil ha %{size} og kan ta noe tid å gjengi. Vil du likevel gjengi den?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@
units: "Enheter"
validation_failure_date: "er ikke en gyldig dato"
validation_failure_integer: "er ikke et gyldig heltall"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ pl:
label_units: "Jednostki"
label_week_reporting: "Tygodniu (wydatki)"
label_year_reporting: "Roku (wydatki)"
label_count: "Ilość"
label_filter: "Filtr"
label_filter_add: "Dodaj filtr"
label_filter_plural: "Filtry"
label_group_by: "Grupuj według"
label_group_by_add: "Dodaj grupowanie po atrybucie"
label_inactive: "«nieaktywne»"
label_no: "Nie"
label_none: "(brak danych)"
label_report: "Raport"
label_yes: "Tak"
load_query_question: "Raport będzie zawierał %{size} komórek tabeli. Eksport może zająć trochę czasu. Czy nadal chcesz wygenerować raport?"
permission_save_cost_reports: "Zapisz publiczny raport kosztów"
permission_save_private_cost_reports: "Zapisz prywatny raport kosztów"
@ -80,7 +69,3 @@ pl:
units: "Jednostki"
validation_failure_date: "nie jest poprawną datą"
validation_failure_integer: "nie jest prawidłową liczbą całkowitą"
reporting:
group_by:
selected_columns: "Wybrane kolumny"
selected_rows: "Wybrane wiersze"

@ -60,17 +60,6 @@ pt:
label_units: "Unidades"
label_week_reporting: "Semana (gasto)"
label_year_reporting: "Ano (gasto)"
label_count: "Contar"
label_filter: "Filtro"
label_filter_add: "Adicionar filtro"
label_filter_plural: "Filtros"
label_group_by: "Agrupar por"
label_group_by_add: "Adicionar atributo Agrupar por"
label_inactive: "«inativo»"
label_no: "Não"
label_none: "(sem dados)"
label_report: "Relatório"
label_yes: "Sim"
load_query_question: "Relatório terá %{size} células da tabela e pode levar algum tempo para processar. Você ainda quer tentar processá-lo?"
permission_save_cost_reports: "Salvar relatórios públicos de custos"
permission_save_private_cost_reports: "Salvar relatórios privados de custos"
@ -80,7 +69,3 @@ pt:
units: "Unidades"
validation_failure_date: "não é uma data válida"
validation_failure_integer: "não é um valor inteiro válido"
reporting:
group_by:
selected_columns: "Colunas selecionadas"
selected_rows: "Linhas Selecionadas"

@ -60,17 +60,6 @@ ro:
label_units: "Unități"
label_week_reporting: "Săptămână (consumată)"
label_year_reporting: "An (consumat)"
label_count: "Count"
label_filter: "Filtrare"
label_filter_add: "Add Filter"
label_filter_plural: "Filtre"
label_group_by: "Grupare după"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "Nu"
label_none: "(no data)"
label_report: "Raportare"
label_yes: "Da"
load_query_question: "Raportul va avea %{size} de celule şi e posibil ca generarea să dureze un timp. Sunteți sigur că doriți generarea?"
permission_save_cost_reports: "Salvare rapoarte de cost publice"
permission_save_private_cost_reports: "Salvare rapoarte de cost private"
@ -80,7 +69,3 @@ ro:
units: "Unități"
validation_failure_date: "nu e o dată validă"
validation_failure_integer: "nu e un întreg valid"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ ru:
label_units: "Модули"
label_week_reporting: "Неделя (Потрачено)"
label_year_reporting: "Год (потрачено)"
label_count: "Количество"
label_filter: "Фильтр"
label_filter_add: "Добавить фильтр"
label_filter_plural: "Фильтры"
label_group_by: "Группировать по"
label_group_by_add: "Добавить атрибут \"Группировать по\""
label_inactive: "«неактивен»"
label_no: "Нет"
label_none: "(нет данных)"
label_report: "Отчет"
label_yes: "да"
load_query_question: "Отчет будет иметь %{size} ячеек таблицы и может занять некоторое время для визуализации. Вы все еще хотите его сформировать?"
permission_save_cost_reports: "Сохранить отчеты о публичных расходах"
permission_save_private_cost_reports: "Сохранить отчеты о частных расходах"
@ -80,7 +69,3 @@ ru:
units: "Модули"
validation_failure_date: "не является допустимой датой"
validation_failure_integer: "не является допустимым целым числом"
reporting:
group_by:
selected_columns: "Выбранные столбцы"
selected_rows: "Выбранные строки"

@ -60,17 +60,6 @@ sk:
label_units: "Jednotky"
label_week_reporting: "Týždeň (Strávil)"
label_year_reporting: "Rok (Strávil)"
label_count: "Počet"
label_filter: "Filtrovať"
label_filter_add: "Pridať filter"
label_filter_plural: "Filtre"
label_group_by: "Zoskupiť podľa"
label_group_by_add: "Pridať atribút \"zoskupiť podľa\""
label_inactive: "«neaktívny»"
label_no: "Nie"
label_none: "(žiadne údaje)"
label_report: "Report"
label_yes: "Áno"
load_query_question: "Výsledná tlačová zostava bude obsahovať %{size} buniek a jej vytvorenie môže trvať dlhšie. Želáte si ju aj napriek tomu vygenerovať?"
permission_save_cost_reports: "Uložiť výkaz vyhodnotenia celkových nákladov"
permission_save_private_cost_reports: "Uložiť výkaz vyhodnotenia osobných nákladov"
@ -80,7 +69,3 @@ sk:
units: "Jednotky"
validation_failure_date: "nie je platný dátum"
validation_failure_integer: "nie je platné celé číslo"
reporting:
group_by:
selected_columns: "Vybrané stĺpce"
selected_rows: "Vybrané riadky"

@ -60,17 +60,6 @@ sl:
label_units: "Enote"
label_week_reporting: "Teden (Porabljeno)"
label_year_reporting: "Leto (Porabljeno)"
label_count: "Šteti"
label_filter: "Filtriraj"
label_filter_add: "Dodajte filter"
label_filter_plural: "Filtri"
label_group_by: "Razvrsti po"
label_group_by_add: "Dodajte atribut Group-by"
label_inactive: "«neaktiven»"
label_no: "Ne"
label_none: "(ni podatkov)"
label_report: "Poročilo"
label_yes: "Da"
load_query_question: "Poročilo bo imelo %{size} celice tabel zato lahko traja nekaj časa, da se upodobi. \nAli še vedno želite poskusiti upodabljanje?"
permission_save_cost_reports: "Shrani javno stroškovno poročilo"
permission_save_private_cost_reports: "Shrani zasebno stroškovno poročilo"
@ -80,7 +69,3 @@ sl:
units: "Enote"
validation_failure_date: "ni veljaven datum"
validation_failure_integer: "ni veljavno število"
reporting:
group_by:
selected_columns: "Izbrani stolpci"
selected_rows: "Izbrane vrstice"

@ -60,17 +60,6 @@ sv:
label_units: "Enheter"
label_week_reporting: "Vecka (spenderade)"
label_year_reporting: "År (spenderade)"
label_count: "Antal"
label_filter: "Filter"
label_filter_add: "Lägg till filter"
label_filter_plural: "Filter"
label_group_by: "Gruppera efter"
label_group_by_add: "Lägg till Gruppera-efter-Attribut"
label_inactive: "«inaktiv»"
label_no: "Nej"
label_none: "(inga data)"
label_report: "Rapport"
label_yes: "Ja"
load_query_question: "Rapporten kommer att ha %{size} celler och kan ta lite tid att skapa. Vill du prova att skapa den ändå?"
permission_save_cost_reports: "Spara offentliga kostnadsrapporter"
permission_save_private_cost_reports: "Spara privata kostnadsrapporter"
@ -80,7 +69,3 @@ sv:
units: "Enheter"
validation_failure_date: "inte är ett giltigt datum"
validation_failure_integer: "är inte ett giltigt heltal"
reporting:
group_by:
selected_columns: "Valda kolumner"
selected_rows: "Markerade rader"

@ -60,17 +60,6 @@ tr:
label_units: "Birimler"
label_week_reporting: "Hafta (Harcanan)"
label_year_reporting: "Yıl (Harcanan)"
label_count: "Sayı"
label_filter: "Filtre"
label_filter_add: "Süzgeç ekle"
label_filter_plural: "Filtreler"
label_group_by: "Grupla"
label_group_by_add: "Grubu Özelliklere Ekleyin"
label_inactive: "«etkin olmayan»"
label_no: "Hayır"
label_none: "(veri yok)"
label_report: "Rapor"
label_yes: "Evet"
load_query_question: "Rapor %{size} tablo hücreleri içeriyor ve işlenmesi biraz zaman alabilir. Raporu yine de çalıştırmayı denemek ister misin?"
permission_save_cost_reports: "Genele açık maliyet raporlarını kaydet"
permission_save_private_cost_reports: "Özel maliyet raporlarını kaydet"
@ -80,7 +69,3 @@ tr:
units: "Birimler"
validation_failure_date: "geçerli bir tarih değil"
validation_failure_integer: "geçerli bir tamsayı değil"
reporting:
group_by:
selected_columns: "Seçili sütunlar"
selected_rows: "Seçili satırlar"

@ -60,17 +60,6 @@ uk:
label_units: "Одиниці"
label_week_reporting: "Тиждень (витрачений)"
label_year_reporting: "Рік (витрачений)"
label_count: "Підрахунок"
label_filter: "Фільтр"
label_filter_add: "Додати фільтр"
label_filter_plural: "Фільтри"
label_group_by: "Групувати за"
label_group_by_add: "Додати групу за атрибутом"
label_inactive: "«неактивний»"
label_no: "Ні"
label_none: "(немає даних)"
label_report: "Звіт"
label_yes: "Так"
load_query_question: "Звіт матиме %{size} комірок таблиці і може зайняти деякий час для візуалізації. Ви все ще бажаєте спробувати її відобразити?"
permission_save_cost_reports: "Зберегти публічні звіти про витрати"
permission_save_private_cost_reports: "Зберегти приватні звіти про витрати"
@ -80,7 +69,3 @@ uk:
units: "Одиниці"
validation_failure_date: "є недійсною датою"
validation_failure_integer: "не є дійсним цілим числом"
reporting:
group_by:
selected_columns: "Вибрані стовпці"
selected_rows: "Виділені рядки"

@ -60,17 +60,6 @@ vi:
label_units: "Units"
label_week_reporting: "Week (Spent)"
label_year_reporting: "Year (Spent)"
label_count: "Count"
label_filter: "Bộ lọc"
label_filter_add: "Add Filter"
label_filter_plural: "Bộ lọc"
label_group_by: "Nhóm theo"
label_group_by_add: "Add Group-by Attribute"
label_inactive: "«inactive»"
label_no: "Không"
label_none: "(no data)"
label_report: "Báo cáo"
label_yes: "Có"
load_query_question: "Report will have %{size} table cells and may take some time to render. Do you still want to try rendering it?"
permission_save_cost_reports: "Save public cost reports"
permission_save_private_cost_reports: "Save private cost reports"
@ -80,7 +69,3 @@ vi:
units: "Units"
validation_failure_date: "is not a valid date"
validation_failure_integer: "is not a valid integer"
reporting:
group_by:
selected_columns: "Selected columns"
selected_rows: "Selected rows"

@ -60,17 +60,6 @@ zh-CN:
label_units: "单位"
label_week_reporting: "周(已过)"
label_year_reporting: "年(已过)"
label_count: "数量"
label_filter: "筛选器"
label_filter_add: "添加筛选器"
label_filter_plural: "筛选器"
label_group_by: "分组依据"
label_group_by_add: "添加分组依据属性"
label_inactive: "«不活动»"
label_no: "否"
label_none: "(无数据)"
label_report: "报告"
label_yes: "是"
load_query_question: "报告有 %{size} 个表格单元格,可能需要一些时间渲染。您仍然想要尝试渲染它吗?"
permission_save_cost_reports: "保存公共成本报告"
permission_save_private_cost_reports: "保存私人成本报告"
@ -80,7 +69,3 @@ zh-CN:
units: "单位"
validation_failure_date: "不是有效的日期"
validation_failure_integer: "不是有效的整数"
reporting:
group_by:
selected_columns: "选定的列"
selected_rows: "选定的行"

@ -60,17 +60,6 @@ zh-TW:
label_units: "單位"
label_week_reporting: "星期 (已用)"
label_year_reporting: "年 (已用)"
label_count: "數量"
label_filter: "篩選器"
label_filter_add: "新增篩選器"
label_filter_plural: "篩選器"
label_group_by: "分組依據"
label_group_by_add: "新增分組依據屬性"
label_inactive: "«不活動»"
label_no: "否"
label_none: "(沒有資料)"
label_report: "報表"
label_yes: "是"
load_query_question: "報告含有 %{size} 個儲存格,將要花一些時間呈現。你仍然想要嘗試顯示它嗎?"
permission_save_cost_reports: "保存公開成本報告"
permission_save_private_cost_reports: "保存私密成本報告"
@ -80,7 +69,3 @@ zh-TW:
units: "單位"
validation_failure_date: "不是一個有效日期"
validation_failure_integer: "不是一個有效的整數"
reporting:
group_by:
selected_columns: "選擇列"
selected_rows: "選定行"

Loading…
Cancel
Save