working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ af:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2994,7 +2994,7 @@ ar:
title:"حذف حزمة العمل"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ az:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ bg:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'Com a mínim s''ha d''especificar un dia laboral.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'Els canvis anteriors a la configuració de dies laborals encara no s''han aplicat.'
time_entry:
attributes:
@ -2906,7 +2906,7 @@ ca:
title:"Suprimir el paquet de treball"
working_days:
info:>
<b>Defineix els dies que es consideren part de la setmana laboral.</b><br/> Els dies no seleccionats seran omesos en planificar paquets de treball (i no seran inclosos en contar dies). Aquests poden ser substituïts directament als paquets de treball.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Canvia els dies laborals"
warning:>
Canviar quins dies de la setmana són laborals pot afectar les dates d'inici i final de tots els paquets de treball a tots els projectes en aquesta instància.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ ckb-IR:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'Je třeba uvést alespoň jeden pracovní den.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2957,7 +2957,7 @@ cs:
title:"Odstranit pracovní balíček"
working_days:
info:>
<b>Definujte dny považované za část pracovního týdne</b><br/> dny, které jsou při plánování pracovních balíčků označeny jsou přeskočeny (a nejsou zahrnuty do celkového denního počtu). Tyto mohou být přepsány na úrovni pracovního balíčku.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Změna, těch dnů v týdnu, které jsou považovány za pracovní dny, může ovlivnit datum zahájení a datum ukončení všech pracovních balíčků ve všech projektech v této instanci.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2913,7 +2913,7 @@ da:
title:"Slet arbejdspakken"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2911,7 +2911,7 @@ de:
title:"Arbeitspaket löschen"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2911,7 +2911,7 @@ el:
title:"Διαγραφή του πακέτου εργασίας"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ eo:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'Se necesita especificar al menos un día laborable.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'Los cambios anteriores en la configuración de días laborables no se han aplicado aún.'
time_entry:
attributes:
@ -2912,7 +2912,7 @@ es:
title:"Eliminar el pauqete de trabajo"
working_days:
info:>
<b>Definir días considerados parte de la semana laboral.</b><br/> Los días que no están seleccionados se omiten al programar paquetes de trabajo (y no están incluidos en la cuenta de días). Estos pueden ser substituidos en los paquetes de trabajo.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Cambiar los días laborables"
warning:>
Cambiar qué días de la semana se consideran laborables puede afectar a las fechas de inicio y fin de todos los paquetes de trabajo en todos los proyectos de esta instancia.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ et:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ fa:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ fi:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2915,7 +2915,7 @@ fil:
title:"Tanggalin ang work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2916,7 +2916,7 @@ fr:
title:"Supprimer le lot de travaux"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2959,7 +2959,7 @@ he:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2915,7 +2915,7 @@ hi:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2938,7 +2938,7 @@ hr:
title:"Izbriši radni paket"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2913,7 +2913,7 @@ hu:
title:"Munkacsomag törlése"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2891,7 +2891,7 @@ id:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2914,7 +2914,7 @@ it:
title:"Eliminare la macro-attività"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2891,7 +2891,7 @@ ja:
title:"ワークパッケージの削除"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2892,7 +2892,7 @@ ko:
title:"작업 패키지 삭제"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2953,7 +2953,7 @@ lt:
title:"Ištrinti darbų paketą"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2933,7 +2933,7 @@ lv:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ ne:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2912,7 +2912,7 @@ nl:
title:"Werkpakket verwijderen"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'Należy określić co najmniej jeden dzień roboczy.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2953,7 +2953,7 @@ pl:
title:"Usuń Zestawy zadań"
working_days:
info:>
<b>Zdefiniuj dni uważane za część tygodnia pracy</b><br/> Dni, które nie zostały wybrane, są pomijane podczas planowania zadań (i nie są uwzględnione w liczniku dni). Mogą one zostać zastąpione na poziomie pakietu roboczego.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Zmień dni robocze"
warning:>
Zmiana, które dni tygodnia są uważane za dni robocze, może w tym przypadku wpłynąć na dni rozpoczęcia i zakończenia wszystkich pakietów roboczych we wszystkich projektach.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2913,7 +2913,7 @@ pt:
title:"Excluir o pacote de trabalho"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2937,7 +2937,7 @@ ro:
title:"Ştergere a pachetului de lucru"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'По крайней мере один рабочий день должен быть указан.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'Предыдущие изменения конфигурации рабочих дней еще не были применены.'
time_entry:
attributes:
@ -2954,7 +2954,7 @@ ru:
title:"Удалить пакет работ"
working_days:
info:>
<b>Определить считаемые дни рабочей недели</b><br/> Дни, которые не выбраны, пропускаются при планировании пакетов работ (и не включены в число дней). Они могут быть переопределены на уровне рабочих пакетов.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Изменить рабочие дни"
warning:>
Изменение дней недели, считающихся рабочими днями, может повлиять на начало и завершение всех пакетов работ во всех проектах в данном случае.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ rw:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2917,7 +2917,7 @@ si:
title:"වැඩ පැකේජය මකන්න"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2958,7 +2958,7 @@ sk:
title:"Odstrániť pracovný balík"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2955,7 +2955,7 @@ sl:
title:"Izbriši delovni paket"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2913,7 +2913,7 @@ sv:
title:"Radera arbetspaketet"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2896,7 +2896,7 @@ th:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2916,7 +2916,7 @@ tr:
title:"İş paketini sil"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2950,7 +2950,7 @@ uk:
title:"Видаліть робочий пакет"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2897,7 +2897,7 @@ vi:
title:"Delete the work package"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.
working_days_are_missing:'At least one working day needs to be specified.'
working_days_are_missing:'At least one day of the week must be defined as a working day.'
previous_working_day_changes_unprocessed:'The previous changes to the working days configuration have not been applied yet.'
time_entry:
attributes:
@ -2895,7 +2895,7 @@ zh-TW:
title:"刪除工作項目"
working_days:
info:>
<b>Define days considered part of the work week</b><br/> Days that are not selected are skipped when scheduling work packages (and not included in the day count). These can be overriden at a work-package level.
<b>Define the working days of the week</b><br/> Non-working days are skipped when scheduling work packages and are excluded when calculating duration. This can be overridden at a work-package level.
change_button:"Change working days"
warning:>
Changing which days of the week are considered working days can affect the start and finish days of all work packages in all projects in this instance.