#-- copyright
|
|
|
# OpenProject is a project management system.
|
|
|
# Copyright (C) 2012-2018 the OpenProject Foundation (OPF)
|
|
|
#
|
|
|
# This program is free software; you can redistribute it and/or
|
|
|
# modify it under the terms of the GNU General Public License version 3.
|
|
|
#
|
|
|
# OpenProject is a fork of ChiliProject, which is a fork of Redmine. The copyright follows:
|
|
|
# Copyright (C) 2006-2017 Jean-Philippe Lang
|
|
|
# Copyright (C) 2010-2013 the ChiliProject Team
|
|
|
#
|
|
|
# This program is free software; you can redistribute it and/or
|
|
|
# modify it under the terms of the GNU General Public License
|
|
|
# as published by the Free Software Foundation; either version 2
|
|
|
# of the License, or (at your option) any later version.
|
|
|
#
|
|
|
# This program is distributed in the hope that it will be useful,
|
|
|
# but WITHOUT ANY WARRANTY; without even the implied warranty of
|
|
|
# MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the
|
|
|
# GNU General Public License for more details.
|
|
|
#
|
|
|
# You should have received a copy of the GNU General Public License
|
|
|
# along with this program; if not, write to the Free Software
|
|
|
# Foundation, Inc., 51 Franklin Street, Fifth Floor, Boston, MA 02110-1301, USA.
|
|
|
#
|
|
|
# See docs/COPYRIGHT.rdoc for more details.
|
|
|
#++
|
|
|
en:
|
|
|
seeders:
|
|
|
bim:
|
|
|
default_type_clash: Clash
|
|
|
default_type_issue: Issue
|
|
|
default_type_remark: Remark
|
|
|
default_type_request: Request
|
|
|
default_status_resolved: Resolved
|
|
|
default_priority_critical: Critical
|
|
|
demo_data:
|
|
|
global_queries:
|
|
|
- name: "Embedded table: Children"
|
|
|
parent: '{id}'
|
|
|
timeline: false
|
|
|
sort_by: id
|
|
|
hidden: true
|
|
|
is_public: false
|
|
|
columns:
|
|
|
- type
|
|
|
- id
|
|
|
- subject
|
|
|
- status
|
|
|
- assigned_to
|
|
|
- priority
|
|
|
- project
|
|
|
type_configuration:
|
|
|
- type: :default_type_phase
|
|
|
form_configuration:
|
|
|
- group_name: "Children"
|
|
|
query_name: "Embedded table: Children"
|
|
|
groups:
|
|
|
- name: Architects
|
|
|
- name: BIM Coordinators
|
|
|
- name: BIM Managers
|
|
|
- name: BIM Modellers
|
|
|
- name: Lead BIM Coordinators
|
|
|
- name: MEP Engineers
|
|
|
- name: Planners
|
|
|
- name: Structural Engineers
|
|
|
welcome:
|
|
|
title: "Welcome to OpenProject BIM Edition!"
|
|
|
text: |
|
|
|
Checkout the demo projects to get started with some examples.
|
|
|
|
|
|
* [(Demo) Construction project](%{base_url}/projects/demo-construction-project): Planning, BIM process, BCF management, and constructing, all at a glance.
|
|
|
* [(Demo) Planning & constructing](%{base_url}/projects/demo-planning-constructing-project): Classical planning and construction management.
|
|
|
* [(Demo) Bim project](%{base_url}/projects/demo-bim-project): BIM process and coordination.
|
|
|
* [(Demo) BCF management](%{base_url}/projects/demo-bcf-management-project): BCF management.
|
|
|
|
|
|
Also, you can create a blank [new project](%{base_url}/projects/new).
|
|
|
|
|
|
Never stop collaborating. With open source and open mind.
|
|
|
|
|
|
You can change this welcome text [here](%{base_url}/settings).
|
|
|
projects:
|
|
|
demo-construction-project:
|
|
|
name: (Demo) Construction project
|
|
|
identifier: demo-construction-project
|
|
|
description: >
|
|
|
**This is a demo project**. You can edit the description in
|
|
|
the [Project settings -> Description](%{base_url}/projects/demo-construction-project/settings).
|
|
|
timeline:
|
|
|
name: Timeline
|
|
|
modules:
|
|
|
- work_package_tracking
|
|
|
- news
|
|
|
- wiki
|
|
|
- board_view
|
|
|
news:
|
|
|
- title: Welcome to your demo project
|
|
|
summary: >
|
|
|
We are glad you joined.
|
|
|
In this module you can communicate project news to your team members.
|
|
|
description: The actual news
|
|
|
types:
|
|
|
- :default_type_task
|
|
|
- :default_type_milestone
|
|
|
- :default_type_phase
|
|
|
categories:
|
|
|
- Category 1 (to be changed in Project settings)
|
|
|
queries:
|
|
|
- name: Project plan
|
|
|
status: open
|
|
|
timeline: true
|
|
|
sort_by: id
|
|
|
hierarchy: true
|
|
|
- name: Milestones
|
|
|
status: open
|
|
|
type: :default_type_milestone
|
|
|
timeline: true
|
|
|
columns:
|
|
|
- id
|
|
|
- type
|
|
|
- status
|
|
|
- subject
|
|
|
- start_date
|
|
|
- due_date
|
|
|
sort_by: id
|
|
|
- name: Tasks
|
|
|
status: open
|
|
|
type: :default_type_task
|
|
|
hierarchy: true
|
|
|
sort_by: id
|
|
|
columns:
|
|
|
- id
|
|
|
- subject
|
|
|
- priority
|
|
|
- type
|
|
|
- status
|
|
|
- assigned_to
|
|
|
boards:
|
|
|
bcf:
|
|
|
name: "Simple drag'n drop workflow"
|
|
|
work_packages: []
|
|
|
demo-planning-constructing-project:
|
|
|
name: (Demo) Planning & constructing
|
|
|
identifier: demo-planning-constructing-project
|
|
|
parent: demo-construction-project
|
|
|
description: >
|
|
|
**This is a demo project**. You can edit the description in
|
|
|
the [Project settings -> Description](%{base_url}/projects/demo-planning-constructing-project/settings).
|
|
|
timeline:
|
|
|
name: Timeline
|
|
|
modules:
|
|
|
- work_package_tracking
|
|
|
- news
|
|
|
- wiki
|
|
|
- board_view
|
|
|
news:
|
|
|
- title: Welcome to your demo project
|
|
|
summary: >
|
|
|
We are glad you joined.
|
|
|
In this module you can communicate project news to your team members.
|
|
|
description: The actual news
|
|
|
types:
|
|
|
- :default_type_task
|
|
|
- :default_type_milestone
|
|
|
- :default_type_phase
|
|
|
categories:
|
|
|
- Category 1 (to be changed in Project settings)
|
|
|
queries:
|
|
|
- name: Project plan
|
|
|
status: open
|
|
|
timeline: true
|
|
|
sort_by: id
|
|
|
hierarchy: true
|
|
|
- name: Milestones
|
|
|
status: open
|
|
|
type: :default_type_milestone
|
|
|
timeline: true
|
|
|
columns:
|
|
|
- id
|
|
|
- type
|
|
|
- status
|
|
|
- subject
|
|
|
- start_date
|
|
|
- due_date
|
|
|
sort_by: id
|
|
|
- name: Tasks
|
|
|
status: open
|
|
|
type: :default_type_task
|
|
|
hierarchy: true
|
|
|
sort_by: id
|
|
|
columns:
|
|
|
- id
|
|
|
- subject
|
|
|
- priority
|
|
|
- type
|
|
|
- status
|
|
|
- assigned_to
|
|
|
work_packages:
|
|
|
- :start: 4
|
|
|
:subject: Project kick off construction project
|
|
|
:description: |-
|
|
|
The project kick off initializes the start of the project in your company. Everybody being part of this project should be invited to the kick off for a first briefing.
|
|
|
|
|
|
The next step could be checking out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-construction-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Planners
|
|
|
:duration: 0
|
|
|
- :start: 7
|
|
|
:subject: Basic evaluation
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 7
|
|
|
:subject: Gathering first project information
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Define tasks based on the customer needs
|
|
|
* Time frame and cost estimation shall be defined
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Identify the customer needs by having a workshop with him/ her
|
|
|
* Each need shall represent a task with its corresponding work packages
|
|
|
* Derive the cost estimation and time frame
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 4
|
|
|
- :start: 14
|
|
|
:subject: Summarize the results
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Create a usefull overview of the results
|
|
|
* Check what has been done and summarize the results
|
|
|
* Communicate all the relevant results with the customer
|
|
|
* Identify the fundamental boundary conditions of the project
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Each topic gets its own overview which will be used as a catalouge of results
|
|
|
* This overview informs all participants about the decisions made
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 4
|
|
|
:relations:
|
|
|
- :to: Gathering first project information
|
|
|
:type: follows
|
|
|
- :start: 21
|
|
|
:subject: End of basic evaluation
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Planners
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Summarize the results
|
|
|
:type: follows
|
|
|
:assigned_to: Planners
|
|
|
:duration: 14
|
|
|
:relations:
|
|
|
- :to: Project kick off construction project
|
|
|
:type: follows
|
|
|
- :start: 22
|
|
|
:subject: Preliminary planning
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 22
|
|
|
:subject: Developing first draft
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Create a usefull overview of the results
|
|
|
* Check what has been done and summarize the results
|
|
|
* Communicate all the relevant results with the customer
|
|
|
* Identify the fundamental boundary conditions of the project
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Each topic gets its own overview which will be used as a catalouge of results
|
|
|
* This overview informs all participants about the decisions made
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 10
|
|
|
:relations:
|
|
|
- :to: End of basic evaluation
|
|
|
:type: follows
|
|
|
- :start: 35
|
|
|
:subject: Summarize results
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Create a usefull overview of the results
|
|
|
* Check what has been done and summarize the results
|
|
|
* Communicate all the relevant results with the customer
|
|
|
* Identify the fundamental boundary conditions of the project
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Each topic gets its own overview which will be used as a catalouge of results
|
|
|
* This overview informs all participants about the decisions made
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 4
|
|
|
:relations:
|
|
|
- :to: Developing first draft
|
|
|
:type: follows
|
|
|
:assigned_to: Planners
|
|
|
:duration: 17
|
|
|
- :start: 42
|
|
|
:subject: Passing of preliminary planning
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Planners
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Summarize results
|
|
|
:type: follows
|
|
|
- :start: 44
|
|
|
:subject: Design planning
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 44
|
|
|
:subject: Finishing design
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Design is done
|
|
|
* All parties are happy with the results of the design planning phase
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* The design of the project will be finished
|
|
|
* All parties agree on the design
|
|
|
* The owner is happy with the results
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 45
|
|
|
:relations:
|
|
|
- :to: Passing of preliminary planning
|
|
|
:type: follows
|
|
|
- :start: 90
|
|
|
:subject: Design freeze
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Planners
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Finishing design
|
|
|
:type: follows
|
|
|
:assigned_to: Planners
|
|
|
:duration: 46
|
|
|
- :start: 98
|
|
|
:subject: Construction phase
|
|
|
:description: ''
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 98
|
|
|
:subject: Start constructing
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Ground breaking ceremony
|
|
|
* Setting up the construction site
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Preparing the site for the project
|
|
|
* Get the team together
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 31
|
|
|
- :start: 130
|
|
|
:subject: Foundation
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Laying of the foundation stone
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Setting up the concrete mixer
|
|
|
* Setting up the supply chain for the concrete
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 25
|
|
|
:relations:
|
|
|
- :to: Start constructing
|
|
|
:type: follows
|
|
|
- :start: 149
|
|
|
:subject: Building construction
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Topping out ceremony
|
|
|
* Walls and ceilings are done
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Creating all structural levels of the building
|
|
|
* Installing doors and windows
|
|
|
* Finishing the roof structure
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 46
|
|
|
- :start: 164
|
|
|
:subject: Finishing the facade
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Facade is done
|
|
|
* Whole building is waterproof
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Install all elements for the facade
|
|
|
* Finish the roof
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 32
|
|
|
- :start: 178
|
|
|
:subject: Installing the building service systems
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* All building service systems are ready to be used
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Installing the heating system
|
|
|
* Installing the climate system
|
|
|
* Electrical installation
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 25
|
|
|
- :start: 189
|
|
|
:subject: Final touches
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Handover of the keys
|
|
|
* The customer is happy with his building
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Finishing the installation of the building service systems
|
|
|
* Finishing the interior construction
|
|
|
* Finishing the facade
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 18
|
|
|
- :start: 208
|
|
|
:subject: House warming party
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Have a blast!
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Invite the construction team
|
|
|
* Invite your friends
|
|
|
* Bring some drinks, snacks and your smile
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Final touches
|
|
|
:type: follows
|
|
|
:assigned_to: Planners
|
|
|
:duration: 110
|
|
|
:relations:
|
|
|
- :to: Design freeze
|
|
|
:type: follows
|
|
|
demo-bim-project:
|
|
|
name: (Demo) BIM project
|
|
|
identifier: demo-bim-project
|
|
|
parent: demo-construction-project
|
|
|
description: >
|
|
|
**This is a demo project**. You can edit the description in
|
|
|
the [Project settings -> Description](%{base_url}/projects/demo-bim-project/settings).
|
|
|
timeline:
|
|
|
name: Timeline
|
|
|
modules:
|
|
|
- work_package_tracking
|
|
|
- news
|
|
|
- wiki
|
|
|
- board_view
|
|
|
news:
|
|
|
- title: Welcome to your demo project
|
|
|
summary: >
|
|
|
We are glad you joined.
|
|
|
In this module you can communicate project news to your team members.
|
|
|
description: The actual news
|
|
|
types:
|
|
|
- :default_type_task
|
|
|
- :default_type_milestone
|
|
|
- :default_type_phase
|
|
|
categories:
|
|
|
- Category 1 (to be changed in Project settings)
|
|
|
queries:
|
|
|
- name: Project plan
|
|
|
status: open
|
|
|
timeline: true
|
|
|
sort_by: id
|
|
|
hierarchy: true
|
|
|
- name: Milestones
|
|
|
status: open
|
|
|
type: :default_type_milestone
|
|
|
timeline: true
|
|
|
columns:
|
|
|
- id
|
|
|
- type
|
|
|
- status
|
|
|
- subject
|
|
|
- start_date
|
|
|
- due_date
|
|
|
sort_by: id
|
|
|
- name: Tasks
|
|
|
status: open
|
|
|
type: :default_type_task
|
|
|
hierarchy: true
|
|
|
sort_by: id
|
|
|
columns:
|
|
|
- id
|
|
|
- subject
|
|
|
- priority
|
|
|
- type
|
|
|
- status
|
|
|
- assigned_to
|
|
|
work_packages:
|
|
|
- :start: 14
|
|
|
:subject: Project kick off creating BIM model
|
|
|
:description: |-
|
|
|
The project Kickoff initializes the start of the project in your company. The whole project team should be invited to the Kickoff for a first briefing.
|
|
|
|
|
|
The next step could be to check out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-bim-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Managers
|
|
|
:duration: 0
|
|
|
- :start: 15
|
|
|
:subject: Project preperation
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 15
|
|
|
:subject: Gathering the project specific data and information for the BIM model
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Identify the information strategy for the customer (e.g. by using plain language questions)
|
|
|
* If provided, analyze the customer information requirements for the BIM model
|
|
|
* Define an information delivery strategy according to the customers needs
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* Analyzing the customers needs and goals for using the BIM methodology
|
|
|
* Results of this tasks should be:
|
|
|
* The requirements for the project
|
|
|
* A strategy for the delivery phase
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Planners
|
|
|
:duration: 3
|
|
|
:relations:
|
|
|
- :to: Project kick off creating BIM model
|
|
|
:type: follows
|
|
|
- :start: 21
|
|
|
:subject: Creating the BIM execution plan
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* A BIM execution plan will be defined according to the exchange requirements specifications (ERS)
|
|
|
* All team members and partners have a plan on how to reach each of the project goals
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* Depending on the identifies use cases, the individual Information Delivery Manuals will be defined
|
|
|
* To handle the technological interfaces, a software topology will be defined and analyzed and verified
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 18
|
|
|
:relations:
|
|
|
- :to: Gathering the project specific data and information for the BIM model
|
|
|
:type: follows
|
|
|
- :start: 40
|
|
|
:subject: Completion of the BIM execution plan
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Creating the BIM execution plan
|
|
|
:type: follows
|
|
|
:assigned_to: BIM Managers
|
|
|
:duration: 25
|
|
|
- :start: 41
|
|
|
:subject: End of preperation phase
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Managers
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Project preperation
|
|
|
:type: follows
|
|
|
- :start: 44
|
|
|
:subject: Creating inital BIM model
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 44
|
|
|
:subject: Modelling inital BIM model
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Modelling the inital BIM model
|
|
|
* Creating a BIM model for the whole project team
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* According to the gathered data from the customer, the inital model will be modelled
|
|
|
* The model shall be modelled according to the LOD Matrices and contain the information needed
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 7
|
|
|
:relations:
|
|
|
- :to: End of preperation phase
|
|
|
:type: follows
|
|
|
- :start: 52
|
|
|
:subject: Initial, internal model check and revising
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Submitting a BIM model according to the defined standards
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 2
|
|
|
:relations:
|
|
|
- :to: Modelling inital BIM model
|
|
|
:type: follows
|
|
|
- :start: 58
|
|
|
:subject: Submitting inital BIM model
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Initial, internal model check and revising
|
|
|
:type: follows
|
|
|
:assigned_to: Architects
|
|
|
:duration: 14
|
|
|
:relations:
|
|
|
- :to: Completion of the BIM execution plan
|
|
|
:type: follows
|
|
|
- :start: 59
|
|
|
:subject: Modelling, first cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 59
|
|
|
:subject: Referencing external BIM models
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Having a foundation for developing the internal model/ offering answers
|
|
|
* Using the external model to develop the internal model
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* The external model will be referenced in the BIM platform, thus used for modelling the internal model
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Submitting inital BIM model
|
|
|
:type: follows
|
|
|
- :start: 60
|
|
|
:subject: Modelling the BIM model
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Creating a BIM model for the project
|
|
|
* Creating a BIM model for the whole project team
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* The model will be created according to the BIM execution plan
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 7
|
|
|
:relations:
|
|
|
- :to: Referencing external BIM models
|
|
|
:type: follows
|
|
|
- :start: 68
|
|
|
:subject: First Cycle, internal model check and revising
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Submitting a BIM model according to the defined standards
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised.
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 1
|
|
|
:relations:
|
|
|
- :to: Modelling the BIM model
|
|
|
:type: follows
|
|
|
- :start: 72
|
|
|
:subject: Submitting BIM model
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: First Cycle, internal model check and revising
|
|
|
:type: follows
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 13
|
|
|
:relations:
|
|
|
- :to: Submitting inital BIM model
|
|
|
:type: follows
|
|
|
- :start: 73
|
|
|
:subject: Coordination, first cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 73
|
|
|
:subject: Coordinate the different BIM models
|
|
|
:description: |-
|
|
|
# Goal
|
|
|
|
|
|
* Assemble the different BIM models of the whole project team
|
|
|
* Coordinate the identified issues
|
|
|
|
|
|
# Description
|
|
|
|
|
|
* The different BIM models will be assembled and checked
|
|
|
* The identified model specific issues will be communicated via BCF files
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 3
|
|
|
- :start: 73
|
|
|
:subject: Issue management, first cycle
|
|
|
:description: ''
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 9
|
|
|
- :start: 83
|
|
|
:subject: Finishing coordination, first cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Issue management, first cycle
|
|
|
:type: follows
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 10
|
|
|
:relations:
|
|
|
- :to: Submitting BIM model
|
|
|
:type: follows
|
|
|
- :start: 86
|
|
|
:subject: Modelling & coordinating, second cycle
|
|
|
:description: "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Finishing coordination, first cycle
|
|
|
:type: follows
|
|
|
- :start: 88
|
|
|
:subject: Modelling & coordinating, ... cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Modelling & coordinating, second cycle
|
|
|
:type: follows
|
|
|
- :start: 89
|
|
|
:subject: Modelling & coordinating, (n-th minus 1) cycle
|
|
|
:description: "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Modelling & coordinating, ... cycle
|
|
|
:type: follows
|
|
|
- :start: 90
|
|
|
:subject: Modelling & coordinating n-th cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Modelling & coordinating, (n-th minus 1) cycle
|
|
|
:type: follows
|
|
|
- :start: 91
|
|
|
:subject: Finishing modelling & coordinating, n-th cycle
|
|
|
:description: This type is hierarchicaly a parent of the types "Clash"
|
|
|
and "Request", thus represents a general note.
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Modelling & coordinating n-th cycle
|
|
|
:type: follows
|
|
|
- :start: 93
|
|
|
:subject: Use model for construction phase
|
|
|
:description: ''
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:children:
|
|
|
- :start: 93
|
|
|
:subject: Handover model for construction crew
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* Everyone knows the model and their tasks
|
|
|
* Everybody gets all the relevant information, model based
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* The Kickoff on the construction site includes an introduction to the model
|
|
|
* All the objects should have the information needed for the assigned tasks. If not, data enrichment of the model needs to be done
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 8
|
|
|
- :start: 106
|
|
|
:subject: Construct the building
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* New issues realized on construction site will be handled model based
|
|
|
* Issues will be documented by using the BCF files and the BIM model
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* New issues will be documented using BCF files as sticky notes for the model
|
|
|
* The BCF files will be used to assign, track and correct issues
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_task
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 101
|
|
|
- :start: 208
|
|
|
:subject: Finish construction
|
|
|
:description: ''
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Construct the building
|
|
|
:type: follows
|
|
|
:assigned_to: BIM Coordinators
|
|
|
:duration: 115
|
|
|
:relations:
|
|
|
- :to: Finishing modelling & coordinating, n-th cycle
|
|
|
:type: follows
|
|
|
- :start: 98
|
|
|
:subject: Issue management, construction phase
|
|
|
:description: ''
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:assigned_to: Planners
|
|
|
:duration: 88
|
|
|
- :start: 210
|
|
|
:subject: Handover for Facility Management
|
|
|
:description: |-
|
|
|
## Goal
|
|
|
|
|
|
* The BIM model will be used for the Facility Management
|
|
|
* The model provides all the relevant information for commissioning and operating the building
|
|
|
* ...
|
|
|
|
|
|
## Description
|
|
|
|
|
|
* The model contains the relevant information for the facility manager
|
|
|
* The model can be used for the operating system of the building
|
|
|
* ...
|
|
|
:status: default_status_new
|
|
|
:type: default_type_milestone
|
|
|
:assigned_to: Lead BIM Coordinators
|
|
|
:duration: 0
|
|
|
:relations:
|
|
|
- :to: Finish construction
|
|
|
:type: follows
|
|
|
- :start: 212
|
|
|
:subject: Asset Management
|
|
|
:description: Enjoy your building :)
|
|
|
:status: default_status_new
|
|
|
:type: default_type_phase
|
|
|
:relations:
|
|
|
- :to: Handover for Facility Management
|
|
|
:type: follows
|
|
|
demo-bcf-management-project:
|
|
|
name: (Demo) BCF management
|
|
|
identifier: demo-bcf-management-project
|
|
|
parent: demo-bim-project
|
|
|
description: >
|
|
|
**This is a demo project for BCF**. You can edit the description in
|
|
|
the [Project settings -> Description](%{base_url}/projects/demo-bcf-management-project/settings).
|
|
|
timeline:
|
|
|
name: Timeline
|
|
|
modules:
|
|
|
- work_package_tracking
|
|
|
- bcf
|
|
|
- board_view
|
|
|
types:
|
|
|
- :default_type_task
|
|
|
- :default_type_milestone
|
|
|
- :default_type_phase
|
|
|
- 'seeders.bim.default_type_clash'
|
|
|
- 'seeders.bim.default_type_request'
|
|
|
- 'seeders.bim.default_type_issue'
|
|
|
- 'seeders.bim.default_type_remark'
|
|
|
categories:
|
|
|
- Category 1 (to be changed in Project settings)
|
|
|
queries:
|
|
|
- name: Issues
|
|
|
status: open
|
|
|
type: 'seeders.bim.default_type_issue'
|
|
|
- name: Clashes
|
|
|
status: open
|
|
|
type: 'seeders.bim.default_type_clash'
|
|
|
- name: Requests
|
|
|
status: open
|
|
|
type: 'seeders.bim.default_type_request'
|
|
|
- name: Remarks
|
|
|
status: open
|
|
|
type: 'seeders.bim.default_type_remark'
|
|
|
- name: Project plan
|
|
|
status: open
|
|
|
timeline: true
|
|
|
sort_by: id
|
|
|
hierarchy: true
|
|
|
- name: Milestones
|
|
|
status: open
|
|
|
type: :default_type_milestone
|
|
|
timeline: true
|
|
|
columns:
|
|
|
- id
|
|
|
- type
|
|
|
- status
|
|
|
- subject
|
|
|
- start_date
|
|
|
- due_date
|
|
|
sort_by: id
|
|
|
- name: Tasks
|
|
|
status: open
|
|
|
type: :default_type_task
|
|
|
hierarchy: true
|
|
|
sort_by: id
|
|
|
columns:
|
|
|
- id
|
|
|
- subject
|
|
|
- priority
|
|
|
- type
|
|
|
- status
|
|
|
- assigned_to
|
|
|
boards:
|
|
|
bcf:
|
|
|
name: "BCF issues"
|
|
|
bcf_xml_file: "seed.bcfzip"
|
|
|
work_packages:
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: f210a2cd-f1f7-4691-b986-2f94117caefe
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: feb97e6e-14fd-4c62-bbad-607f2bb4ebf5
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: f55d0ec0-9a0f-4222-9926-cc5744888b02
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 4
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: fc560c06-51fc-44fa-81b4-e688be189c6a
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: fe2f9c1f-631b-4b37-91ea-833c4751725a
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: 010d9884-8c93-4551-b2bc-570faffe7082
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: febee8e1-1ad2-45e5-b08d-b4be92d25ad6
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: f4d71d45-5a2c-4dad-bcb1-8a4935f2ea69
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: fb9705ea-b32c-46ff-bb6f-d1d049494e05
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 4
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 73
|
|
|
:bcf_issue_uuid: faad0e05-0e05-48d8-96e6-a4fe29ecdbc0
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: fbbf9ecf-5721-4bf1-a08c-aed50dc19353
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: f6271a32-acf5-49f8-a1b5-7c445f9158e5
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: 00efc0da-b4d5-4933-bcb6-e01513ee2bcc
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: f9e079a8-02f5-40f0-a08a-171f494ee130
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: f70417a8-174a-42ae-bf1e-a0b6457d0e6f
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: fc5099c0-bedb-4770-a576-0429a7733517
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 79
|
|
|
:bcf_issue_uuid: fbe1d941-06ce-45f4-8ccb-ef48b8426f72
|
|
|
:assigned_to: BIM Modellers
|
|
|
:duration: 3
|
|
|
:parent: Issue management, first cycle
|
|
|
- :start: 98
|
|
|
:bcf_issue_uuid: 73def76d-939d-404c-9bd0-581399f92714
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 98
|
|
|
:bcf_issue_uuid: b5105e2e-add1-4d48-abb9-ce51fcea3bdd
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 98
|
|
|
:bcf_issue_uuid: 99f03fde-4c74-4a8f-940a-c741738ab073
|
|
|
:duration: 2
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 111
|
|
|
:bcf_issue_uuid: af1de642-6d08-489b-8056-ca4c383e0617
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 114
|
|
|
:bcf_issue_uuid: e6276745-3d58-4d40-80fb-6de5cb05077e
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 149
|
|
|
:bcf_issue_uuid: efd7be98-1a64-4a35-ad4c-51b8881d79ed
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 152
|
|
|
:bcf_issue_uuid: f689bfd4-ec09-45ca-bbe3-7d1d0f5d9933
|
|
|
:duration: 21
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 178
|
|
|
:bcf_issue_uuid: 3746180f-ba1e-4ea0-a0fb-6ee69ccabd85
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
- :start: 178
|
|
|
:bcf_issue_uuid: 2adbdbb4-bb60-4250-b8af-3cd786437814
|
|
|
:duration: 8
|
|
|
:parent: Issue management, construction phase
|
|
|
|