OpenProject is the leading open source project management software.
You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
openproject/modules/bim/config/locales/en.seeders.bim.yml

1222 lines
51 KiB

#-- copyright
# OpenProject is an open source project management software.
# Copyright (C) 2012-2020 the OpenProject GmbH
#
# This program is free software; you can redistribute it and/or
# modify it under the terms of the GNU General Public License version 3.
#
# OpenProject is a fork of ChiliProject, which is a fork of Redmine. The copyright follows:
# Copyright (C) 2006-2017 Jean-Philippe Lang
# Copyright (C) 2010-2013 the ChiliProject Team
#
# This program is free software; you can redistribute it and/or
# modify it under the terms of the GNU General Public License
# as published by the Free Software Foundation; either version 2
# of the License, or (at your option) any later version.
#
# This program is distributed in the hope that it will be useful,
# but WITHOUT ANY WARRANTY; without even the implied warranty of
# MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the
# GNU General Public License for more details.
#
# You should have received a copy of the GNU General Public License
# along with this program; if not, write to the Free Software
# Foundation, Inc., 51 Franklin Street, Fifth Floor, Boston, MA 02110-1301, USA.
#
# See docs/COPYRIGHT.rdoc for more details.
#++
en:
seeders:
bim:
default_type_clash: Clash
default_type_issue: Issue
default_type_remark: Remark
default_type_request: Request
default_status_resolved: Resolved
default_priority_critical: Critical
demo_data:
global_queries:
- name: "Embedded table: Children"
parent: '{id}'
timeline: false
sort_by: id
hidden: true
is_public: false
columns:
- type
- id
- subject
- status
- assigned_to
- priority
- project
type_configuration:
- type: :default_type_phase
form_configuration:
- group_name: "Children"
query_name: "Embedded table: Children"
groups:
- name: Architects
- name: BIM Coordinators
- name: BIM Managers
- name: BIM Modellers
- name: Lead BIM Coordinators
- name: MEP Engineers
- name: Planners
- name: Structural Engineers
welcome:
title: "Welcome to OpenProject BIM Edition!"
text: |
Checkout the demo projects to get started with some examples.
* [(Demo) Construction project](%{base_url}/projects/demo-construction-project): Planning, BIM process, BCF management, and constructing, all at a glance.
* [(Demo) Planning & constructing](%{base_url}/projects/demo-planning-constructing-project): Classical planning and construction management.
* [(Demo) Bim project](%{base_url}/projects/demo-bim-project): BIM process and coordination.
* [(Demo) BCF management](%{base_url}/projects/demo-bcf-management-project): BCF management.
Also, you can create a blank [new project](%{base_url}/projects/new).
Never stop collaborating. With open source and open mind.
You can change this welcome text [here](%{base_url}/settings).
projects:
demo-construction-project:
name: (Demo) Construction project
identifier: demo-construction-project
status:
code: on_track
description: All tasks and the sub-projects are on schedule. The people involved know their tasks. The system is completely set up.
description: This is a short summary of the goals of this demo construction project.
timeline:
name: Timeline
modules:
- work_package_tracking
- news
- wiki
- board_view
news:
- title: Welcome to your demo project
summary: >
We are glad you joined.
In this module you can communicate project news to your team members.
description: The actual news
types:
- :default_type_task
- :default_type_milestone
- :default_type_phase
categories:
- Category 1 (to be changed in Project settings)
queries:
- name: Project plan
status: open
timeline: true
sort_by: start_date
hierarchy: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
- name: Milestones
status: open
type: :default_type_milestone
timeline: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
sort_by: start_date
- name: Tasks
status: open
type: :default_type_task
hierarchy: true
sort_by: id
columns:
- id
- subject
- priority
- type
- status
- assigned_to
boards:
bcf:
name: "Simple drag'n drop workflow"
work_packages: []
demo-planning-constructing-project:
name: (Demo) Planning & constructing
identifier: demo-planning-constructing-project
status:
code: on_track
description: All tasks are on schedule. The people involved know their tasks. The system is completely set up.
parent: demo-construction-project
description: This is a short summary of the goals of this demo planning and constructing project.
timeline:
name: Timeline
modules:
- work_package_tracking
- news
- wiki
- board_view
news:
- title: Welcome to your demo project
summary: >
We are glad you joined.
In this module you can communicate project news to your team members.
description: The actual news
types:
- :default_type_task
- :default_type_milestone
- :default_type_phase
categories:
- Category 1 (to be changed in Project settings)
queries:
- name: Project plan
status: open
timeline: true
sort_by: start_date
hierarchy: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
- name: Milestones
status: open
type: :default_type_milestone
timeline: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
sort_by: start_date
- name: Tasks
status: open
type: :default_type_task
hierarchy: true
sort_by: id
columns:
- id
- subject
- priority
- type
- status
- assigned_to
work_packages:
- :start: 4
:subject: Project kick off construction project
:description: |-
The project kick off initializes the start of the project in your company. Everybody being part of this project should be invited to the kick off for a first briefing.
The next step could be checking out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-construction-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
:status: default_status_new
:type: default_type_milestone
:assigned_to: Planners
:duration: 0
- :start: 7
:subject: Basic evaluation
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 7
:subject: Gathering first project information
:description: |-
## Goal
* Define tasks based on the customer needs
* Time frame and cost estimation shall be defined
## Description
* Identify the customer needs by having a workshop with him/ her
* Each need shall represent a task with its corresponding work packages
* Derive the cost estimation and time frame
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 4
- :start: 14
:subject: Summarize the results
:description: |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 4
:relations:
- :to: Gathering first project information
:type: follows
- :start: 21
:subject: End of basic evaluation
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: Planners
:duration: 0
:relations:
- :to: Summarize the results
:type: follows
:assigned_to: Planners
:duration: 14
:relations:
- :to: Project kick off construction project
:type: follows
- :start: 22
:subject: Preliminary planning
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 22
:subject: Developing first draft
:description: |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 10
:relations:
- :to: End of basic evaluation
:type: follows
- :start: 35
:subject: Summarize results
:description: |-
## Goal
* Create a usefull overview of the results
* Check what has been done and summarize the results
* Communicate all the relevant results with the customer
* Identify the fundamental boundary conditions of the project
## Description
* Each topic gets its own overview which will be used as a catalouge of results
* This overview informs all participants about the decisions made
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 4
:relations:
- :to: Developing first draft
:type: follows
:assigned_to: Planners
:duration: 17
- :start: 42
:subject: Passing of preliminary planning
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: Planners
:duration: 0
:relations:
- :to: Summarize results
:type: follows
- :start: 44
:subject: Design planning
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 44
:subject: Finishing design
:description: |-
## Goal
* Design is done
* All parties are happy with the results of the design planning phase
## Description
* The design of the project will be finished
* All parties agree on the design
* The owner is happy with the results
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 45
:relations:
- :to: Passing of preliminary planning
:type: follows
- :start: 90
:subject: Design freeze
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: Planners
:duration: 0
:relations:
- :to: Finishing design
:type: follows
:assigned_to: Planners
:duration: 46
- :start: 98
:subject: Construction phase
:description: ''
:status: default_status_new
:type: default_type_phase
:children:
- :start: 98
:subject: Start constructing
:description: |-
## Goal
* Ground breaking ceremony
* Setting up the construction site
* ...
## Description
* Preparing the site for the project
* Get the team together
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 31
- :start: 130
:subject: Foundation
:description: |-
## Goal
* Laying of the foundation stone
* ...
## Description
* Setting up the concrete mixer
* Setting up the supply chain for the concrete
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 25
:relations:
- :to: Start constructing
:type: follows
- :start: 149
:subject: Building construction
:description: |-
## Goal
* Topping out ceremony
* Walls and ceilings are done
* ...
## Description
* Creating all structural levels of the building
* Installing doors and windows
* Finishing the roof structure
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 46
- :start: 164
:subject: Finishing the facade
:description: |-
## Goal
* Facade is done
* Whole building is waterproof
* ...
## Description
* Install all elements for the facade
* Finish the roof
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 32
- :start: 178
:subject: Installing the building service systems
:description: |-
## Goal
* All building service systems are ready to be used
## Description
* Installing the heating system
* Installing the climate system
* Electrical installation
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 25
- :start: 189
:subject: Final touches
:description: |-
## Goal
* Handover of the keys
* The customer is happy with his building
* ...
## Description
* Finishing the installation of the building service systems
* Finishing the interior construction
* Finishing the facade
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 18
- :start: 208
:subject: House warming party
:description: |-
## Goal
* Have a blast!
## Description
* Invite the construction team
* Invite your friends
* Bring some drinks, snacks and your smile
:status: default_status_new
:type: default_type_milestone
:duration: 0
:relations:
- :to: Final touches
:type: follows
:assigned_to: Planners
:duration: 110
:relations:
- :to: Design freeze
:type: follows
demo-bim-project:
name: (Demo) BIM project
identifier: demo-bim-project
status:
code: on_track
description: All tasks and sub-projects are on schedule. The people involved know their tasks. The system is completely set up.
parent: demo-construction-project
description: This is a short summary of the goals of this demo BIM project.
timeline:
name: Timeline
modules:
- work_package_tracking
- news
- wiki
- board_view
news:
- title: Welcome to your demo project
summary: >
We are glad you joined.
In this module you can communicate project news to your team members.
description: The actual news
types:
- :default_type_task
- :default_type_milestone
- :default_type_phase
categories:
- Category 1 (to be changed in Project settings)
queries:
- name: Project plan
status: open
timeline: true
sort_by: start_date
hierarchy: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
- name: Milestones
status: open
type: :default_type_milestone
timeline: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
sort_by: start_date
- name: Tasks
status: open
type: :default_type_task
hierarchy: true
sort_by: id
columns:
- id
- subject
- priority
- type
- status
- assigned_to
work_packages:
- :start: 14
:subject: Project kick off creating BIM model
:description: |-
The project Kickoff initializes the start of the project in your company. The whole project team should be invited to the Kickoff for a first briefing.
The next step could be to check out the timetable and adjusting the appointments, by looking at the [Gantt chart](%{base_url}/projects/demo-bim-project/work_packages?query_props=%7B%22c%22%3A%5B%22id%22%2C%22subject%22%2C%22startDate%22%2C%22dueDate%22%5D%2C%22tv%22%3Atrue%2C%22tzl%22%3A%22weeks%22%2C%22hi%22%3Atrue%2C%22g%22%3A%22%22%2C%22t%22%3A%22startDate%3Aasc%22%2C%22f%22%3A%5B%7B%22n%22%3A%22status%22%2C%22o%22%3A%22o%22%2C%22v%22%3A%5B%5D%7D%5D%2C%22pa%22%3A1%2C%22pp%22%3A100%7D).
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Managers
:duration: 0
- :start: 15
:subject: Project preperation
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 15
:subject: Gathering the project specific data and information for the BIM model
:description: |-
## Goal
* Identify the information strategy for the customer (e.g. by using plain language questions)
* If provided, analyze the customer information requirements for the BIM model
* Define an information delivery strategy according to the customers needs
## Description
* Analyzing the customers needs and goals for using the BIM methodology
* Results of this tasks should be:
* The requirements for the project
* A strategy for the delivery phase
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Planners
:duration: 14
:relations:
- :to: Project kick off creating BIM model
:type: follows
- :start: 33
:subject: Creating the BIM execution plan
:description: |-
# Goal
* A BIM execution plan will be defined according to the exchange requirements specifications (ERS)
* All team members and partners have a plan on how to reach each of the project goals
# Description
* Depending on the identifies use cases, the individual Information Delivery Manuals will be defined
* To handle the technological interfaces, a software topology will be defined and analyzed and verified
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Lead BIM Coordinators
:duration: 18
:relations:
- :to: Gathering the project specific data and information for the BIM model
:type: follows
- :start: 52
:subject: Completion of the BIM execution plan
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: seeders.bim.default_status_resolved
:type: default_type_milestone
:assigned_to: BIM Coordinators
:duration: 0
:relations:
- :to: Creating the BIM execution plan
:type: follows
:assigned_to: BIM Managers
:duration: 37
- :start: 53
:subject: End of preperation phase
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Managers
:duration: 0
:relations:
- :to: Project preperation
:type: follows
- :start: 54
:subject: Creating inital BIM model
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 54
:subject: Modelling inital BIM model
:description: |-
# Goal
* Modelling the inital BIM model
* Creating a BIM model for the whole project team
# Description
* According to the gathered data from the customer, the inital model will be modelled
* The model shall be modelled according to the LOD Matrices and contain the information needed
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Modellers
:duration: 7
:relations:
- :to: End of preperation phase
:type: follows
- :start: 62
:subject: Initial, internal model check and revising
:description: |-
# Goal
* Submitting a BIM model according to the defined standards
# Description
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: Lead BIM Coordinators
:duration: 2
:relations:
- :to: Modelling inital BIM model
:type: follows
- :start: 65
:subject: Submitting inital BIM model
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Modellers
:duration: 0
:relations:
- :to: Initial, internal model check and revising
:type: follows
:assigned_to: Architects
:duration: 11
:relations:
- :to: Completion of the BIM execution plan
:type: follows
- :start: 66
:subject: Modelling, first cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 66
:subject: Referencing external BIM models
:description: |-
# Goal
* Having a foundation for developing the internal model/ offering answers
* Using the external model to develop the internal model
# Description
* The external model will be referenced in the BIM platform, thus used for modelling the internal model
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Modellers
:duration: 0
:relations:
- :to: Submitting inital BIM model
:type: follows
- :start: 67
:subject: Modelling the BIM model
:description: |-
# Goal
* Creating a BIM model for the project
* Creating a BIM model for the whole project team
# Description
* The model will be created according to the BIM execution plan
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Modellers
:duration: 6
:relations:
- :to: Referencing external BIM models
:type: follows
- :start: 74
:subject: First Cycle, internal model check and revising
:description: |-
# Goal
* Submitting a BIM model according to the defined standards
# Description
* The model shall be checked, according to the defined standards (conventions, LOD, ...) and revised.
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Coordinators
:duration: 1
:relations:
- :to: Modelling the BIM model
:type: follows
- :start: 76
:subject: Submitting BIM model
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Modellers
:duration: 0
:relations:
- :to: First Cycle, internal model check and revising
:type: follows
:assigned_to: BIM Coordinators
:duration: 10
:relations:
- :to: Submitting inital BIM model
:type: follows
- :start: 77
:subject: Coordination, first cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:children:
- :start: 77
:subject: Coordinate the different BIM models
:description: |-
# Goal
* Assemble the different BIM models of the whole project team
* Coordinate the identified issues
# Description
* The different BIM models will be assembled and checked
* The identified model specific issues will be communicated via BCF files
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Coordinators
:duration: 3
- :start: 77
:subject: Issue management, first cycle
:description: ''
:status: default_status_new
:type: default_type_phase
:assigned_to: BIM Coordinators
:duration: 4
- :start: 82
:subject: Finishing coordination, first cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: Lead BIM Coordinators
:duration: 0
:relations:
- :to: Issue management, first cycle
:type: follows
:assigned_to: Lead BIM Coordinators
:duration: 5
:relations:
- :to: Submitting BIM model
:type: follows
- :start: 83
:subject: Modelling & coordinating, second cycle
:description: "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
:status: default_status_new
:type: default_type_phase
:assigned_to: Lead BIM Coordinators
:duration: 0
:relations:
- :to: Finishing coordination, first cycle
:type: follows
- :start: 84
:subject: Modelling & coordinating, ... cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:assigned_to: Lead BIM Coordinators
:duration: 0
:relations:
- :to: Modelling & coordinating, second cycle
:type: follows
- :start: 85
:subject: Modelling & coordinating, (n-th minus 1) cycle
:description: "## Goal\r\n\r\n* ...\r\n\r\n## Description\r\n\r\n* ..."
:status: default_status_new
:type: default_type_phase
:assigned_to: Lead BIM Coordinators
:duration: 0
:relations:
- :to: Modelling & coordinating, ... cycle
:type: follows
- :start: 86
:subject: Modelling & coordinating n-th cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_phase
:assigned_to: BIM Coordinators
:duration: 0
:relations:
- :to: Modelling & coordinating, (n-th minus 1) cycle
:type: follows
- :start: 87
:subject: Finishing modelling & coordinating, n-th cycle
:description: This type is hierarchicaly a parent of the types "Clash"
and "Request", thus represents a general note.
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Coordinators
:duration: 0
:relations:
- :to: Modelling & coordinating n-th cycle
:type: follows
- :start: 88
:subject: Use model for construction phase
:description: ''
:status: default_status_new
:type: default_type_phase
:children:
- :start: 88
:subject: Handover model for construction crew
:description: |-
## Goal
* Everyone knows the model and their tasks
* Everybody gets all the relevant information, model based
* ...
## Description
* The Kickoff on the construction site includes an introduction to the model
* All the objects should have the information needed for the assigned tasks. If not, data enrichment of the model needs to be done
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Coordinators
:duration: 5
- :start: 98
:subject: Construct the building
:description: |-
## Goal
* New issues realized on construction site will be handled model based
* Issues will be documented by using the BCF files and the BIM model
## Description
* New issues will be documented using BCF files as sticky notes for the model
* The BCF files will be used to assign, track and correct issues
* ...
:status: default_status_new
:type: default_type_task
:assigned_to: BIM Coordinators
:duration: 101
- :start: 200
:subject: Finish construction
:description: ''
:status: default_status_new
:type: default_type_milestone
:assigned_to: BIM Coordinators
:duration: 0
:relations:
- :to: Construct the building
:type: follows
:assigned_to: BIM Coordinators
:duration: 112
:relations:
- :to: Finishing modelling & coordinating, n-th cycle
:type: follows
- :start: 98
:subject: Issue management, construction phase
:description: ''
:status: default_status_new
:type: default_type_phase
:assigned_to: Planners
:duration: 88
- :start: 210
:subject: Handover for Facility Management
:description: |-
## Goal
* The BIM model will be used for the Facility Management
* The model provides all the relevant information for commissioning and operating the building
* ...
## Description
* The model contains the relevant information for the facility manager
* The model can be used for the operating system of the building
* ...
:status: default_status_new
:type: default_type_milestone
:assigned_to: Lead BIM Coordinators
:duration: 0
:relations:
- :to: Finish construction
:type: follows
- :start: 211
:subject: Asset Management
:description: Enjoy your building :)
:status: default_status_new
:type: default_type_phase
:duration: 0
:relations:
- :to: Handover for Facility Management
:type: follows
demo-bcf-management-project:
name: (Demo) BCF management
identifier: demo-bcf-management-project
status:
code: on_track
description: All tasks are on schedule. The people involved know their tasks. The system is completely set up.
parent: demo-bim-project
description: This is a short summary of the goals of this demo BCF management project.
timeline:
name: Timeline
modules:
- work_package_tracking
- bim
- board_view
ifc_models:
- file: 'hospital_architecture'
name: 'Hospital - Architecture (cc-by-sa-3.0 Autodesk Inc.)'
default: true
- file: 'hospital_structural'
name: 'Hospital - Structural (cc-by-sa-3.0 Autodesk Inc.)'
default: true
- file: 'hospital_mechanical'
name: 'Hospital - Mechanical (cc-by-sa-3.0 Autodesk Inc.)'
default: false
types:
- :default_type_task
- :default_type_milestone
- :default_type_phase
- 'seeders.bim.default_type_clash'
- 'seeders.bim.default_type_request'
- 'seeders.bim.default_type_issue'
- 'seeders.bim.default_type_remark'
categories:
- Category 1 (to be changed in Project settings)
queries:
- name: Issues
status: open
type: 'seeders.bim.default_type_issue'
display_representation: card
- name: Clashes
status: open
type: 'seeders.bim.default_type_clash'
display_representation: card
- name: Requests
status: open
type: 'seeders.bim.default_type_request'
display_representation: card
- name: Remarks
status: open
type: 'seeders.bim.default_type_remark'
display_representation: card
- name: Project plan
status: open
timeline: true
sort_by: start_date
hierarchy: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
- name: Milestones
status: open
type: :default_type_milestone
timeline: true
columns:
- id
- type
- status
- subject
- start_date
- due_date
sort_by: start_date
- name: Tasks
status: open
type: :default_type_task
hierarchy: true
sort_by: id
columns:
- id
- subject
- priority
- type
- status
- assigned_to
5 years ago
boards:
bcf:
name: "BCF issues"
bcf_xml_file: "seed.bcf"
work_packages:
- :start: 77
:bcf_issue_uuid: fbbf9ecf-5721-4bf1-a08c-aed50dc19353
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f6271a32-acf5-49f8-a1b5-7c445f9158e5
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f210a2cd-f1f7-4691-b986-2f94117caefe
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: feb97e6e-14fd-4c62-bbad-607f2bb4ebf5
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: 00efc0da-b4d5-4933-bcb6-e01513ee2bcc
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f9e079a8-02f5-40f0-a08a-171f494ee130
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f70417a8-174a-42ae-bf1e-a0b6457d0e6f
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f55d0ec0-9a0f-4222-9926-cc5744888b02
:assigned_to: BIM Modellers
:duration: 4
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: fc560c06-51fc-44fa-81b4-e688be189c6a
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: fe2f9c1f-631b-4b37-91ea-833c4751725a
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: fc5099c0-bedb-4770-a576-0429a7733517
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: 010d9884-8c93-4551-b2bc-570faffe7082
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: febee8e1-1ad2-45e5-b08d-b4be92d25ad6
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: f4d71d45-5a2c-4dad-bcb1-8a4935f2ea69
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: fb9705ea-b32c-46ff-bb6f-d1d049494e05
:assigned_to: BIM Modellers
:duration: 4
:parent: Issue management, first cycle
- :start: 77
:bcf_issue_uuid: fbe1d941-06ce-45f4-8ccb-ef48b8426f72
:assigned_to: BIM Modellers
:duration: 3
:parent: Issue management, first cycle
- :start: 98
5 years ago
:bcf_issue_uuid: 73def76d-939d-404c-9bd0-581399f92714
:duration: 8
:parent: Issue management, construction phase
- :start: 98
5 years ago
:bcf_issue_uuid: b5105e2e-add1-4d48-abb9-ce51fcea3bdd
:duration: 8
:parent: Issue management, construction phase
- :start: 98
5 years ago
:bcf_issue_uuid: 99f03fde-4c74-4a8f-940a-c741738ab073
:duration: 2
:parent: Issue management, construction phase
5 years ago
- :start: 111
:bcf_issue_uuid: af1de642-6d08-489b-8056-ca4c383e0617
:duration: 8
:parent: Issue management, construction phase
5 years ago
- :start: 114
:bcf_issue_uuid: e6276745-3d58-4d40-80fb-6de5cb05077e
:duration: 8
:parent: Issue management, construction phase
5 years ago
- :start: 149
:bcf_issue_uuid: efd7be98-1a64-4a35-ad4c-51b8881d79ed
:duration: 8
:parent: Issue management, construction phase
5 years ago
- :start: 152
:bcf_issue_uuid: f689bfd4-ec09-45ca-bbe3-7d1d0f5d9933
:duration: 21
:parent: Issue management, construction phase
- :start: 178
:bcf_issue_uuid: 3746180f-ba1e-4ea0-a0fb-6ee69ccabd85
:duration: 8
:parent: Issue management, construction phase
- :start: 178
:bcf_issue_uuid: 2adbdbb4-bb60-4250-b8af-3cd786437814
:duration: 8
:parent: Issue management, construction phase