Bug fixing and small improvements after bug changes for 11.0

corrected links, typos, inconsistencies
[ci skip]

(cherry picked from commit ae0eb147a8)
pull/8801/head
ML-OpenP 4 years ago committed by Markus Kahl
parent a8f04ae044
commit 8956f1121d
  1. 8
      docs/enterprise-edition-guide/README.md
  2. 2
      docs/system-admin-guide/README.md
  3. 6
      docs/system-admin-guide/attribute-help-texts/README.md
  4. 2
      docs/system-admin-guide/manage-work-packages/work-package-status/README.md
  5. 2
      docs/system-admin-guide/manage-work-packages/work-package-types/README.md
  6. 2
      docs/system-admin-guide/manage-work-packages/work-package-workflows/README.md
  7. 38
      docs/user-guide/README.md
  8. 2
      docs/user-guide/agile-boards/README.md
  9. 5
      docs/user-guide/gantt-chart/README.md
  10. 11
      docs/user-guide/gantt-chart/scheduling/README.md
  11. 2
      docs/user-guide/project-overview/README.md
  12. 2
      docs/user-guide/projects/README.md
  13. 6
      docs/user-guide/time-and-costs/time-tracking/README.md
  14. 4
      docs/user-guide/work-packages/README.md
  15. 46
      docs/user-guide/work-packages/create-work-package/README.md
  16. 12
      docs/user-guide/work-packages/work-package-relations-hierarchies/README.md

@ -14,11 +14,11 @@ The Enterprise Edition builds on top of the free Community Edition. An upgrade i
| Popular Topics | Description |
| ------------------------------------------------------------ | :----------------------------------------------------------- |
| [Enterprise Edition trial](#create-an-enterprise-edition-trial) | Can I test the Enterprise Edition for free? |
| [Activate the Enterprise Edition](#activate-the-enterprise-edition) | How can I upgrade my Community Edition to an Enterprise Edition? |
| [Installation support](#installation-support) | How can I get installation support? |
| [Enterprise Edition trial](/enterprise-trial) | Can I test the Enterprise Edition for free? |
| [Activate the Enterprise Edition](/activate-enterprise-edition) | How can I upgrade my Community Edition to an Enterprise Edition? |
| [Installation support](/support) | How can I get installation support? |
<iframe width="560" height="315" src="https://www.youtube.com/embed/YRF_bavXBts" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
<iframe width="560" height="315" src="https://www.youtube-nocookie.com/embed/YRF_bavXBts" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>

@ -27,7 +27,7 @@ Click on one of the categories in order to proceed with the configuration.
| [Users and permissions](./users-permissions) | How to manage users, groups and permissions in OpenProject? |
| [Work packages](./manage-work-packages) | How to configure work packages, types, status and workflows? |
| [Custom fields](./custom-fields) | Set custom fields for work packages, Spent time, projects, versions, users, groups and more. |
| [Attribute help texts](/attribute-help-texts) | Add help texts to explain attributes (including custom fields) in projects and work packages. |
| [Attribute help texts](./attribute-help-texts) | Add help texts to explain attributes (including custom fields) in projects and work packages. |
| [Enumerations](./enumerations) | Set enumerations, e.g. work package priorities, time tracking activities, document categories, and more. |
| [System settings](./system-settings) | Configure your system settings, e.g. a welcome text block on the landing page, display settings, repositories, and more. |
| [Email](./email) | Configure email settings in OpenProject. How to configure email notifications and your email provider? How to set up incoming email? |

@ -24,7 +24,7 @@ This way you will reduce wrong entries for attributes. This is especially releva
| Topic | Content |
| ------------------------------------------------------------ | :--------------------------------------------------------- |
| [Adding Attribute help texts](#adding-an-attribute-help-text) | How to add and configure an Attribute help text. |
| [Adding Attribute help texts](#adding-attribute-help-texts) | How to add and configure an Attribute help text. |
| [Editing or deleting Attribute help texts](#editing-or-deleting-attribute-help-texts) | How to edit and how to delete an Attribute help text. |
| [Work packages](#work-packages) | Where will Attribute help texts for work packages be used? |
| [Projects](#projects) | Where will Attribute help texts for projects be used? |
@ -35,7 +35,7 @@ Navigate to -> *Administration* -> *Attribute help texts* to set up help texts f
## Adding an Attribute help text
## Adding Attribute help texts
To add an Attribute help texts for custom fields click on the green **+ Attribute help text** button.
@ -58,7 +58,7 @@ When the users click on it, they see the description for this attribute.
## Editing or deleting Attribute help texts
## Editing or deleting Attribute help texts
Navigate to -> *Administration* -> *Work packages* -> *Attribute help texts* in order to edit or remove an attribute help text.

@ -2,7 +2,7 @@
sidebar_navigation:
title: Status
priority: 970
description: Manage work package status.
description: Manage Work package status.
robots: index, follow
keywords: work package status
---

@ -2,7 +2,7 @@
sidebar_navigation:
title: Types
priority: 980
description: Configure work package types in OpenProject.
description: Configure Work package types in OpenProject.
robots: index, follow
keywords: work package types
---

@ -3,7 +3,7 @@
sidebar_navigation:
title: Workflows
priority: 970
description: Manage work package workflows.
description: Manage Work package workflows.
robots: index, follow
keywords: work package workflows
---

@ -34,25 +34,25 @@ A module in OpenProject encapsulates a specific set of collaboration functionali
Please choose the module or topic you want to learn more about.
| Popular Topics | Description |
| --------------------------------------------- | :----------------------------------------------------------- |
| [Project overview page](project-overview) | How to create a project overview dashboard with important project information? |
| [Activity](activity) | How to find out about the latest activities in a project? |
| [Roadmap](roadmap) | How to create a product roadmap with OpenProject? |
| [Work packages](work-packages/#work-packages) | How to manage your work in a project? |
| [Gantt chart](#gantt-chart) | How to create and manage a project plan in a Gantt chart? |
| [Boards](agile-boards) | How to work with agile boards for agile project management, e.g. Kanban? |
| [Backlogs (Scrum)](backlogs-scrum) | How to manage a Scrum team in OpenProject with a product backlog and taskboard? |
| [Calendar](calendar) | How to display your work in a calendar in OpenProject? |
| [News](news) | How to create and manage News for your projects? |
| [Forums](forums) | How to manage forums to discuss and comment on topics? |
| [Wiki](wiki) | How to create and manage a wiki to collaboratively document and share information? |
| [Time and costs](time-and-costs) | How to track time and costs in OpenProject and report spent time and costs? |
| [Budgets](budgets) | How to create and manage a project budget? |
| [Members](members/) | How to manage Members in a project? |
| [Documents](documents) | How to upload and share documents in OpenProject? |
| [Meetings](meetings) | How to manage meetings to create and share meeting agenda and meeting minutes? |
| [Manage projects](projects) | Edit, create, copy, delete projects and change project settings. |
| Topic | Content |
| ----------------------------------------- | :----------------------------------------------------------- |
| [Project overview page](project-overview) | How to create a project overview dashboard with important project information? |
| [Activity](activity) | How to find out about the latest activities in a project? |
| [Roadmap](roadmap) | How to create a product roadmap with OpenProject? |
| [Work packages](work-packages) | How to manage your work in a project? |
| [Gantt chart](gantt-chart) | How to create and manage a project plan in a Gantt chart? |
| [Boards](agile-boards) | How to work with Agile boards for agile project management, e.g. Kanban? |
| [Backlogs (Scrum)](backlogs-scrum) | How to manage a Scrum team in OpenProject with a product backlog and taskboard? |
| [Calendar](calendar) | How to display your work in a calendar in OpenProject? |
| [News](news) | How to create and manage News for your projects? |
| [Forums](forums) | How to manage forums to discuss and comment on topics? |
| [Wiki](wiki) | How to create and manage a wiki to collaboratively document and share information? |
| [Time and costs](time-and-costs) | How to track time and costs in OpenProject and report spent time and costs? |
| [Budgets](budgets) | How to create and manage a project budget? |
| [Members](members/) | How to manage Members in a project? |
| [Documents](documents) | How to upload and share documents in OpenProject? |
| [Meetings](meetings) | How to manage meetings to create and share meeting agenda and meeting minutes? |
| [Manage projects](projects) | Edit, create, copy, delete projects and change project settings. |

@ -30,7 +30,7 @@ Our Agile boards can be for anything you would like to keep track of within your
| [Remove cards](#remove-cards) | How to remove cards. |
| [Manage boards](#manage-boards) | How to manage permissions for boards. |
<iframe width="560" height="315" src="https://www.youtube.com/embed/dvmS4tOHVcw" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
<iframe width="560" height="315" src="https://www.youtube-nocookie.com/embed/dvmS4tOHVcw" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
## Agile boards in OpenProject
The new Boards are tightly integrated with all other project management functionalities in OpenProject, i.e. [work packages](#work-pages) or [Gantt charts](#gantt-charts). This makes it so easy and practical to include the Boards in your daily project management routines and to gain a much quicker overview of important topics in your project.

@ -20,10 +20,11 @@ The **Gantt chart** in OpenProject displays the work packages in a timeline. You
| [Activate the Gantt chart](#activate-the-gantt-chart) | How to activate the Gantt chart in OpenProject? |
| [Create a new element](#create-a-new-element-in-the-gantt-chart) | How to add a new item to the Gantt chart? |
| [Relations in the Gantt chart](#relations-in-the-gantt-chart) | Create and display dependencies in the Gantt chart. |
| [Understanding the colours and lines in the Gantt chart](#understanding-the-colours-and-lines-in-the-gantt-chart) | What do the clamps, lines and symbols in the Gantt chart mean? |
| [Gantt chart configuration](#gantt-chart-configuration) | How to configure the view of your Gantt chart, e.g. add labels? |
| [Synchronize data from OpenProject to Excel](#synchronize-data-from-openproject-to-excel) | How to synchronize data from OpenProject to Excel? |
| [Synchronize data between OpenProject and Excel](#synchronize-data-between-openproject-an-excel) | How to synchronize data from OpenProject to Excel? |
| [Gantt chart views](#gantt-chart-views) | How to zoom in and out and activate the Zen mode? |
| [Understanding the colours and lines in the Gantt chart](#Understanding-the-colours-and-lines-in-the-Gantt-chart) | What do the clamps, lines and symbols in the Gantt chart mean? |
| | |
<iframe width="560" height="315" src="https://www.youtube.com/embed/JNRmqWwSfeU" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>

@ -21,7 +21,7 @@ To schedule work packages in the Gantt chart there is an **automatic scheduling
| Topic | Content |
| ------------------------------------------------------- | ------------------------------------------------------------ |
| [Automatic scheduling mode](#automatic-scheduling-mode) | What happens to work packages, when you connect them in automatic scheduling mode? |
| [Manual scheduling mode](#manual scheduling-mode) | What happens to work packages, when you connect them in manual scheduling mode? |
| [Manual scheduling mode](#manual-scheduling-mode) | What happens to work packages, when you connect them in manual scheduling mode? |
| [Changing modes](#changing-modes) | How can I change between manual and automatic scheduling mode? |
@ -45,17 +45,18 @@ Changing to the **manual scheduling mode makes sense if**
- you don't want a parent work package's dates being updated automatically when changing the children's dates, or
- you don't want a follower's start date be automatically updated when you change the predecessor's finish date
<iframe width="560" height="315" src="https://www.youtube.com/embed/Me4cMULZKRM" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
<iframe width="560" height="315" src="https://www.youtube-nocookie.com/embed/Me4cMULZKRM" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
## Change mode
## Changing mode
You can **activate the manual scheduling mode** by clicking on the date of a work package and selecting the box next to "Manual scheduling".
![image-20200929160916841](C:/Users/Matthias Laux/Documents/GitHub/openproject/docs/user-guide/gantt-chart/scheduling/image-20200929160916841.png)
![image-20200929160916841](image-20200929160916841.png)
The pin symbol next to the date indicates that a work package is in manual scheduling mode.
![image-20200929161237109](C:/Users/Matthias Laux/Documents/GitHub/openproject/docs/user-guide/gantt-chart/scheduling/image-20200929161237109.png)
![image-20200929161237109](image-20200929161237109.png)
Changing back to automatic scheduling mode works the same way. Please note: When switching from manual scheduling to automatic scheduling some work packages' dates might be updated according to principles [stated above](#automatic-scheduling-mode).

@ -13,7 +13,7 @@ The **Project overview** page is a dashboard with important project information.
| Feature | Documentation for |
| ------------------------------------------------------------ | ------------------------------------------------------- |
| [What is the project overview?](#what-is-the-project-overview?) | What can I do with the project overview page? |
| [What is the project overview?](#what-is-the-project-overview) | What can I do with the project overview page? |
| [Add a widget to the project overview](#add-a-widget-to-the-project-overview) | How can I add a new widget to the project overview? |
| [Available project overview widgets](#available-project-overview-widgets) | What kind of widgets can I add to the project overview? |
| [Re-size and re-order widgets](#re-size-and-re-order-widgets) | How can I re-order or re-size the widgets? |

@ -144,7 +144,7 @@ Navigate to the [project settings](project-settings) and click **Set as template
![image-20200921120538872](image-20200921120538872.png)
### Use a template project
### Use a project template
You can create a new project by using an existing template. This causes the properties of the project template to be copied to the new project. Find out in our Getting started guide how to [create a new project](../../getting-started/projects/#create-a-new-project) in OpenProject.
Another way for using a template project would be to [copy it](#copy-a-project).

@ -20,9 +20,9 @@ Users can book their time or units spent on an activity within a project directl
| ------------------------------------------------------------ | ------------------------------------------------------------ |
| [Logging time](#logging-time-in-the-work-package-view) | How to log time to work packages? |
| [Track time with Toggl](./toggl-integration) | How to stop spent time with Toggl integration? |
| [Logging time via commit message](#logging-time-via-a-commit message) | How to log time via a commit message to a work package? |
| [Logging time via commit message](#logging-time-via-commit-message) | How to log time via a commit message to a work package? |
| [Edit logged time](#edit-logged-time) | How to edit logged time on a work package? |
| [Delete time entries](#delte-time-entires) | How to delete time entries logged to a work package? |
| [Delete time entries](#delete-time-entires) | How to delete time entries logged to a work package? |
| [Spent time widget on the My Page](#spent-time-widget-on-the-my-page) | How to easily track and display spent time in the spent time widget on the MyPage? |
## Logging time in the work package view
@ -45,7 +45,7 @@ The aggregated time spent on a work package is shown in the work package details
![spent-time-work-package](spent-time-work-package.png)
## Logging time via a commit message
## Logging time via commit message
Note: the “enable time logging” option must be activated under system settings in order to log time via a commit message.

@ -27,14 +27,14 @@ Work packages can be displayed in a projects timeline, e.g. as a milestone or a
| Topic | Content |
| ------------------------------------------------------------ | :----------------------------------------------------------- |
| [Work packages views](work-package-views) | What is the difference between the work packages views: list view, split screen view, details view? |
| [Create a work package](#create-work-packages) | How to create a new work package in OpenProject? |
| [Create a work package](/create-work-package) | How to create a new work package in OpenProject? |
| [Edit work package](edit-work-package) | How to edit a work package in OpenProject? |
| [Copy, move, delete](copy-move-delete) | How to copy, move, delete a work package? |
| [Work package table configuration](work-package-table-configuration) | How to configure the work package table (columns, filters, group by, etc.)? |
| [Exporting](exporting) | How to export work packages for other tools such as Microsoft Excel? |
| [Work package relations and hierarchies](work-package-relations-hierarchies) | How to create work package relations and hierarchies? |
<iframe width="560" height="315" src="https://www.youtube.com/embed/R6-p8HgFmm8" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
<iframe width="560" height="315" src="https://www.youtube-nocookie.com/embed/R6-p8HgFmm8" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
## Frequently asked questions (FAQ)
### How to copy work package hierarchies with their relations?

@ -1,53 +1,53 @@
---
sidebar_navigation:
title: Create work packages
title: Create Work packages
priority: 990
description: How to create work packages in OpenProject?
description: How to create Work packages in OpenProject?
robots: index, follow
keywords: create work packages
keywords: create Work packages
---
# Create work packages
# Create Work packages
| Feature | Documentation for |
| ------------------------------------------------------------ | ---------------------------------------------- |
| [Create work packages](#how-to-create-work-packages?) | How to create a new work package in a project? |
| [Add attachments to a work package](#add-attachments-to-work-packages) | How to add attachments to a work package? |
| [Create Work packages](#how-to-create-work-packages) | How to create a new Work package in a project? |
| [Add attachments to a Work package](#add-attachments-to-work-packages) | How to add attachments to a Work package? |
## How to create work packages?
## How to create Work packages
There are two ways to create new work packages:
There are two ways to create new Work packages:
- work packages can be [created in-line in the work package list](#create-a-work-package-in-the-list-view) (just like Excel) to quickly create multiple work packages.
- work packages can be [created in a split screen](#create-a work-package-in-the-split-screen-view) which allows you to specify detailed information from the start.
- Work packages can be [created in-line in the Work package list](#create-a-work-package-in-the-list-view) (just like Excel) to quickly create multiple Work packages.
- Work packages can be [created in a split screen](#create-a work-package-in-the-split-screen-view) which allows you to specify detailed information from the start.
Work packages always belong to a project. Therefore, you first need to [select a project](../../../getting-started/#open-an-existing-project).
Then, navigate to the work package module in the project navigation.
Then, navigate to the Work package module in the project navigation.
![work-packages-module](1566302949658.png)
### Create a work package in the list view
### Create a Work package in the list view
To create new work packages directly in line in the list view, click on the **+ Create new work package** link below the list.
To create new Work packages directly in line in the list view, click on the **+ Create new Work package** link below the list.
![create-split-screen](create-split-screen.png)
The new work package appears in a green row. Type in the subject of the work package, change attributes, such as Type or Status directly in the list and hit Enter to save the changes.
The new Work package appears in a green row. Type in the subject of the Work package, change attributes, such as Type or Status directly in the list and hit Enter to save the changes.
![create-work-package-list](1566303144875.png)
This way, you can quickly and easily create new work packages in the list, just like Excel.
This way, you can quickly and easily create new Work packages in the list, just like Excel.
### Create a work package in the split screen view
### Create a Work package in the split screen view
In order to enter detailed information to the work package from the start, you can create a work package in the split screen view. In the work package module, click the green **+ Work package** button and select the type of work package you want to create.
In order to enter detailed information to the Work package from the start, you can create a Work package in the split screen view. In the Work package module, click the green **+ Work package** button and select the type of Work package you want to create.
![select-work-package-type](1566303633018.png)
The new work package form will open in the split screen view. Enter all information, such as description, assignee, status, priority, due date and more.
The new Work package form will open in the split screen view. Enter all information, such as description, assignee, status, priority, due date and more.
Click the green **Save** button.
@ -55,19 +55,19 @@ Click the green **Save** button.
To find out **how to create a child work package** please click [here](../work-package-relations-hierachies/#adding-a-child-work-package).
To find out **how to create a child Work package** please click [here](../work-package-relations-hierachies/#adding-a-child-work-package).
## Add attachments to work packages
## Add attachments to Work packages
You can directly add images, e.g. via copy and paste to the **work package description**. You can also use the toolbar above the work package description and click the Insert image icon:
You can directly add images, e.g. via copy and paste to the **Work package description**. You can also use the toolbar above the Work package description and click the Insert image icon:
![insert-image](1566304978459.png)
Also, at the bottom of the work package form you can add files via drag and drop or select the file from a folder to upload it to the work package.
Also, at the bottom of the Work package form you can add files via drag and drop or select the file from a folder to upload it to the Work package.
![add-file](1566305040178.png)
Find out how to [edit existing work packages](#edit-work-packages).
Find out how to [edit existing Work packages](#edit-work-packages).

@ -2,9 +2,9 @@
sidebar_navigation:
title: Work package relations and hierarchies
priority: 600
description: How to add or configure work package relations?
description: How to add or configure Work package relations?
robots: index, follow
keywords: work package relations, hierarchies
keywords: work package relations, hierarchies, child, parent
---
# Work package relations and hierarchies
@ -15,11 +15,11 @@ Hierarchies are a hierarchical relation (parent-child-relationship) vs. relation
| Topic | Content |
| ------------------------------------------------------------ | :----------------------------------------------------------- |
| [Work packages relations](work-package-relations) | How can I set a relation between two work packages and which relations can I set? |
| [Display relations in work package list](#Display-relations-in-work-package-list-(Premium-feature)) | How can I display the relations between two work packages in the work package list? |
| [Work package hierarchies](#Work-package-hierarchies) | What are work package hierarchies? Learn about parent and children work packages. |
| [Work packages relations](#work-package-relations) | How can I set a relation between two work packages and which relations can I set? |
| [Display relations in work package list](#display-relations-in-work-package-list-(premium-feature)) | How can I display the relations between two work packages in the work package list? |
| [Work package hierarchies](#work-package-hierarchies) | What are work package hierarchies? Learn about parent and children work packages. |
| [Adding a child work package](#adding-a-child-work-package) | What are the possibilities to add children work packages? |
| [Change the parent work-package](#change-the-parent-work-package) | How can I change a work package's parent? |
| [Change the parent work package](#change-the-parent-work-package) | How can I change a work package's parent? |
| [Display work package hierarchies](#display-work-package-hierarchies) | Where can I find out about a work package's children and parent? |