OpenProject is the leading open source project management software.
You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
 
 
 
 
 
 
openproject/docs/system-admin-guide/system-settings/project-system-settings/README.md

27 lines
2.0 KiB

---
sidebar_navigation:
title: Project system settings
priority: 800
description: Project system settings in OpenProject.
robots: index, follow
keywords: project system settings
---
# Project system settings
To adapt the system project settings, navigate to *Administration -> System settings -> Projects* where you can configure the following options.
## Settings for new projects
1. Check if **new projects are public by default**. This means that users without an account can access the project without login.
2. Select **which modules should be activated for newly created projects by default**.
3. Choose whether **sequential project identifiers should be created**. If this option is activated, a project identifier for the next project will be offered automatically, based on the existing project name. For example, if a project “Myproject1” was created, “Myproject2” will be offered as identifier for the next project.
4. The **role given to a user in a new project when the user creates a new project but is not an (global) admin**. This makes sense when a user receives the permission to create a new project via [global role](../../users-permissions/roles-permissions/#global-roles).
![default-settings-for-new-projects](image-20210309144536716.png)
## Settings for the Projects Overview List
1. Choose **which columns should be visible** in the Projects Overview List by default.
2. Define the **settings for the Gantt chart view** displayed when clicking on "Open as Gantt view" in the [Projects Overview List](../../../user-guide/projects/#view-all-projects). You can choose filters, columns, sorting and more to configure the view. For more information on how the configuration works please refer to the instructions for the [work package table configuration](../../../user-guide/work-packages/work-package-table-configuration/) in the User guide (as the basic principles are the same).
3. Do not forget to **save** your changes.
![settings-for-project-overview-list](image-20210309144927234.png)